NERC EXAM WITH 200 QUESTIONS AND
CORRECT ANSWERS/ NERC ACTUAL -
LATEST REAL EXAM QUESTIONS AND ALL
CORRECT ANSWERS (BRAND NEW!!)
- According to NERC standards, disturbances that are not identified until
- Immediately
- Within 12 hours
- Within 24 hours
- Within 30 days - ANSWER-c. Within 24 hours
- If a 500 kV transmission line with a surge impedance loading of 800 MW is
- Generator MVAR output would increase
- All system capacitors would trip off-line
- Generator MVAR output would decrease
- All automatic reactors would connect to the system - ANSWER-a. Generator
- If your transmission path is rated for 1200 MW and 1000 MW are scheduled on
sometime after the occur must be reported to NERC
currently loaded at 1400 MW, which of the following events would most likely occur?
MVAR output would increase
it, but due to parallel flows the actual flow is 1300 MW, what action should you take? 1 / 4
- Request that a phase shifting transformer be installed
- Reduce interchange transactions impacting the path
- Request all parallel flow to PSEs to increase schedules
- Reduce all commercial customer load - ANSWER-b. Reduce interchange
- According to NERC Standards, Transmission Operators and Balancing
- 2 days
- 5 days
- 10 days
- 14 days - ANSWER-b. 5 days
- Which of the following actions can a system operator take in order to maintain
- Request generators to absorb maximum MVAR
- Place all operating limits on dynamic calculation
- Raise system voltages as high as possible, but within their operating parameters
- Reduce voltages on the transmission system - ANSWER-c. Raise system
- Which of the following actions should you take if an outage on a neighboring
transactions impacting the path
Authorities must provide their operating personnel with a minimum of how much training annually?
stability on the system?
voltages as high as possible, but within their operating parameters
system has caused a violation on your system? 2 / 4
- Open all tie-lines to your neighbor
- Ask the Reliability Coordinator for assistance
- Shed load to mitigate the violation
- Wait for the neighboring system to contact you - ANSWER-b. Ask the
- If a SOL or IROL violation occurs due to transfers across the system and it is
- Place all system capacitors in service
- Reduce system load
- Inform the Reliability Coordinator
- Dump firm load - ANSWER-c. Inform the Reliability Coordinator
- While performing a pre-outage study, you identify that the transmission outage
- Shed load to mitigate the concern
- Allow the outage to occur and see what happens
- Reschedule the outage if possible
- Allow the outage to take place as long as no load is lost - ANSWER-c.
- Which of the following actions should the system operator implement first if
Reliability Coordinator for assistance
determined that parallel flows are contributing to the violation, what should the system operator do?
will cause a thermal violation on a parallel path, which of the following actions would be the first one you would implement?
Reschedule the outage if possible
transmission line limits exceed the facilities emergency limits based on a 3 / 4
contingency that has not yet occurred, but their protocols are to respond on a pre- contingency basis?
- Reduce voltages in the area of the violation
- Remove the facility from service
- Curtail any interchange transactions that are curtailable
- Only implement actions if the contingency occurs - ANSWER-c. Curtail any
- If a Reliability Coordinator had to implement any type of line loading relief
- Purchasing Selling Entities
- Balancing Authorities
- Transmission Operators
- Load Serving Entities - ANSWER-b. Balancing Authorities
- Transmission Operators
- If a generator is lost in a neighboring Balancing Area, what would the impact
- Nothing
- A net increase of MW would come into your BAs system
- A net increase of MW would go out of your BAs system
- They would exceed their emergency limits - ANSWER-c. A net increase of MW
- / 4
interchange transactions that are curtailable
procedures, which of the following entities would they be coordinated with? Pick two.
be on the BAs transmission tie lines?
would go out of your BAs system