• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NICET LEVEL 1 HIGHWAY CONSTRUCTION

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NICET LEVEL 1 HIGHWAY CONSTRUCTION

Latest Update -70 Questions with 100% Verified Correct Answers with Guaranteed A+ Verified by Professor

Acceptance - CORRECT ANSWER: The written acceptance by the Department of the

Work.

acceptance testing - CORRECT ANSWER: Testing conducted by the Department to

measure the degree of compliance to the Contract

actual cost - CORRECT ANSWER: The computed cost using calculations provided

addendum - CORRECT ANSWER: A Contract revision or response to a Contractor

inquiry issued after advertisement and before the opening of bids.

as-built quantity - CORRECT ANSWER: The quantity of a completed Item eligible for payment

authorized funding amount - CORRECT ANSWER: The amount of funds authorized by

the Department for the Contract

Bidder - CORRECT ANSWER: The individual, firm, partnership, corporation, joint

venture, or any acceptable combination thereof that submits a bid to the Department.

bridge - CORRECT ANSWER: . A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between 1 / 2

undercopings of abutments or extreme ends of openings for multiple boxes. Structure

dimensions are defined as follows:

bridge length - CORRECT ANSWER: The overall length measured along the line of

survey stationing from back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure

bridge width - CORRECT ANSWER: The clear width measured at right angles to the

longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing

Change Order. - CORRECT ANSWER: A written order issued by the Department to the Contractor after execution of the Contract authorizing one or more of the following: 1.Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time.

Commercially Useful Function - CORRECT ANSWER: Occurrences in which the

subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project.

Completion - CORRECT ANSWER: When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion.

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the in-depth analysis in this document. It helped me ace my presentation. Truly superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

NICET LEVEL 1 HIGHWAY CONSTRUCTION Latest Update - 70 Questions with 100% Verified Correct Answers with Guaranteed A+ Verified by Professor Acceptance - CORRECT ANSWER: The written acceptance by th...

Unlock Now
$ 1.00