QSP Exam Latest Update - from Credible Source with 100 Questions and 100% Verified Detailed Correct Answers Guaranteed
A likely precipitation event is any weather pattern that is forecasted to have a __% or greater probability of producing precipitation in the project area.
- 10
- 25
- 50
- 75
e. 99 - CORRECT ANSWER: C
A QSP is responsible for:
- Day to day implementation, inspections, and observations
- Amending the SWPPP as required
- Developing and certifying the SWPPP
d. Certifying reports in SMARTS - CORRECT ANSWER: A
A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an...
- Qualifying rain event
- Extended storm event
- Inactive storm event
d. Unsafe monitoring event - CORRECT ANSWER: A
A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is...
- erosion control 1 / 3
- run on/ run off control
c. sediment control - CORRECT ANSWER: B
Acceptable methods to demonstrate final stabilization include:
- 50%vegetative coverage
- 100% vegetative coverage
c. RUSLE 2 method - CORRECT ANSWER: C
Activities under the CGP include:
- Routine maintenance to maintain original line and grade, hydraulic capacity, or
- Disturbances to land surfaces solely related to agricultural operations.
- Clearing and grading 2 acres of land
original purpose of the facility.
d. Discharges of storm water from areas on tribal lands. - CORRECT ANSWER: C
All NAL data must be uploaded within ___ after NAL exceedance has been identified
- 24 hours
- 1 week
- 10 days
d. 2 weeks - CORRECT ANSWER: C
Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
- Meet the NALs for pH and turbidity
- Not cause or contribute to a violation of water quality standards
- Comply with BMPs as described in the SWPPP
- Be infeasible to eliminate
- Causes or threatens to cause pollution, contamination, or nuisance - CORRECT
ANSWER: E 2 / 3
Hydrologic source controls are a design technique that minimize and/or slow the rate of
stormwater runoff from the site. Examples include:
- Reduction of pervious surfaces
- Use of landscaping as a storm drain treatment feature
- Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility - CORRECT ANSWER: B
If the R Factor is ____, you can apply for the Erosivity Waiver.
- 1
- Less than 1
- 5
d. Less than 5 - CORRECT ANSWER: D
NEL Violation Reports must be submitted to State Board within 24 hours after
exceedance has been identified. NEL's are only subject to:
- Risk Level1
- Risk Level 2
- Risk Level 3
d. ATS Sites only - CORRECT ANSWER: D
Once identified, dischargers shall begin implementing repairs or design changes to
BMPs:
- Immediately
- Within24 hours
- Within48 hours
d. ASAP, but not more than 72 hours - CORRECT ANSWER: D
Permit Registration Documents (PRDs) shall consist of all of the following except:
- / 3