FLORIDA ELECTRICAL BUSINESS (Actual / ) 57 QUESTIONS AND 100% Verified ANSWERS
Failure to maintain OSHA logs could result in a base penalty of ?$1000
The minimum number of employees that will require a contractor to obtain workmen's compensation insurance is ?
- employee
The type of bond that guarantees that the contractor is I'll perform the work in accordance with the contract is know as a ? bond Performance Bond
Short term project schedule is detailed explanation of the next two weeks of construction activities and should be developed and or reviewed by all the following except ?Architect
- / 2
And action for the breach of a written contract must be brought within ______ years
- years
All of the following must follow OSHA regulations standards except _____ establishments Religious
The type of estimate that provides precise statements of quantities of materials, equipment, and man power is considered to be a ______ Detailed estimate
When preparing an equipment estimate ________ would not need to be evaluated Safety factors involved
Under the completed contract method the contractor may realize the profit ______ When the project is nearly complete
- / 2