RTPM Latest Update - 270 Questions and 100% Verified Correct Answers Guaranteed A+
- What are the two distinct processes of telecommunications project management? -
CORRECT ANSWER: design and implementation/instillation
10. Who initiates the project? - CORRECT ANSWER: Sponsor
- Who coordinates construction activities and is in charge of the construction site? -
CORRECT ANSWER: The CM
- Whose primary role during the construction phase is the complete the work? -
CORRECT ANSWER: The GC and subcontractor
102. Who is responsible for obtaining permits? - CORRECT ANSWER: The GC and
subcontractor
103. Who is responsible for arranging required tests? - CORRECT ANSWER: The GC
and subcontractor
104. Who is responsible for maintaining record documents? - CORRECT ANSWER:
The GC and subcontractor
105. Who is responsible for preparing submittals? - CORRECT ANSWER: The GC and
subcontractor
- Who is responsible for maintaining a clean and safe work environment? -
CORRECT ANSWER: The GC and subcontractor
- / 3
- Who is responsible for correcting any work rejected by the owner's representative?
- CORRECT ANSWER: The GC and subcontractor
- List the three types of contracts: - CORRECT ANSWER: Stipulated sum, cost plus
fee, unit price
- What type of contract is the result of negotiations between the owner and
contractor - CORRECT ANSWER: Stipulated sum
- Who is responsible for strategic planning of projects and programs? - CORRECT
ANSWER: Portfolio Manager/Portfolio Review Board
- This form of contract often leads to value engineering that can generate savings
during the construction phase of the building. - CORRECT ANSWER: Cost plus fee
- What type of contract is used when the actual scope of work cannot be determined
at the time of the bid? - CORRECT ANSWER: Unit price
114. What is the key to obtaining effective bids? - CORRECT ANSWER: Unit price
- List the eight commonly required forms during construction administration. -
CORRECT ANSWER: notice to proceed, meeting minutes, request for information, field order, proposal request, change order request, change order, punch list
- What is the form that tells the contractor to begin work on a particular date? -
CORRECT ANSWER: Notice to proceed
- What document keeps track of the issues raised in meetings? - CORRECT
ANSWER: Meeting minutes
- What is used to obtain a formal response to the contract documents? - CORRECT
ANSWER: Request for information 2 / 3
- What document is used to facilitate minor changes to the requirements that do not
require a change order? - CORRECT ANSWER: Field order
- Who ensures that projects and programs meet the overall long-term objectives of
the organization? - CORRECT ANSWER: Portfolio Manager/Portfolio Review Board
- True or False: A contractor may submit a change order request in response to a
field order. - CORRECT ANSWER: Proposal request
- What is used to solicit a quotation from the contractor for a proposed change to the
project scope? - CORRECT ANSWER: Change order request
- What is submitted by the contractor in response to a field order OR as an
uninitiated request for a change in scope? - CORRECT ANSWER: Change order
- What is the formal document that defines the required changes in project scope
and identifies the associated changes to the time frame, the dollar amounts, or both? -
CORRECT ANSWER: Change order
- What summarizes the corrections that a contractor must make prior to the work
being accepted as complete? - CORRECT ANSWER: Punch list
- What is a form of communication between the contractor and owner defining the
specifics of how a job will be undertaken? - CORRECT ANSWER: Submittals
- The construction industry has two common components to submittals which are:
_______ and ________. - CORRECT ANSWER: Shop drawings & Manufacturer's
product data sheet
127. Who provides shop drawings? - CORRECT ANSWER: Specialty contractors such
as: HVAC or Fire Safety