• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

RTPM Latest Update - 270

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

RTPM Latest Update - 270 Questions and 100% Verified Correct Answers Guaranteed A+

  • What are the two distinct processes of telecommunications project management? -

CORRECT ANSWER: design and implementation/instillation

10. Who initiates the project? - CORRECT ANSWER: Sponsor

  • Who coordinates construction activities and is in charge of the construction site? -

CORRECT ANSWER: The CM

  • Whose primary role during the construction phase is the complete the work? -

CORRECT ANSWER: The GC and subcontractor

102. Who is responsible for obtaining permits? - CORRECT ANSWER: The GC and

subcontractor

103. Who is responsible for arranging required tests? - CORRECT ANSWER: The GC

and subcontractor

104. Who is responsible for maintaining record documents? - CORRECT ANSWER:

The GC and subcontractor

105. Who is responsible for preparing submittals? - CORRECT ANSWER: The GC and

subcontractor

  • Who is responsible for maintaining a clean and safe work environment? -

CORRECT ANSWER: The GC and subcontractor

  • / 3
  • Who is responsible for correcting any work rejected by the owner's representative?

- CORRECT ANSWER: The GC and subcontractor

  • List the three types of contracts: - CORRECT ANSWER: Stipulated sum, cost plus
  • fee, unit price

  • What type of contract is the result of negotiations between the owner and

contractor - CORRECT ANSWER: Stipulated sum

  • Who is responsible for strategic planning of projects and programs? - CORRECT

ANSWER: Portfolio Manager/Portfolio Review Board

  • This form of contract often leads to value engineering that can generate savings

during the construction phase of the building. - CORRECT ANSWER: Cost plus fee

  • What type of contract is used when the actual scope of work cannot be determined

at the time of the bid? - CORRECT ANSWER: Unit price

114. What is the key to obtaining effective bids? - CORRECT ANSWER: Unit price

  • List the eight commonly required forms during construction administration. -
  • CORRECT ANSWER: notice to proceed, meeting minutes, request for information, field order, proposal request, change order request, change order, punch list

  • What is the form that tells the contractor to begin work on a particular date? -

CORRECT ANSWER: Notice to proceed

  • What document keeps track of the issues raised in meetings? - CORRECT

ANSWER: Meeting minutes

  • What is used to obtain a formal response to the contract documents? - CORRECT

ANSWER: Request for information 2 / 3

  • What document is used to facilitate minor changes to the requirements that do not

require a change order? - CORRECT ANSWER: Field order

  • Who ensures that projects and programs meet the overall long-term objectives of

the organization? - CORRECT ANSWER: Portfolio Manager/Portfolio Review Board

  • True or False: A contractor may submit a change order request in response to a

field order. - CORRECT ANSWER: Proposal request

  • What is used to solicit a quotation from the contractor for a proposed change to the

project scope? - CORRECT ANSWER: Change order request

  • What is submitted by the contractor in response to a field order OR as an

uninitiated request for a change in scope? - CORRECT ANSWER: Change order

  • What is the formal document that defines the required changes in project scope
  • and identifies the associated changes to the time frame, the dollar amounts, or both? -

CORRECT ANSWER: Change order

  • What summarizes the corrections that a contractor must make prior to the work

being accepted as complete? - CORRECT ANSWER: Punch list

  • What is a form of communication between the contractor and owner defining the

specifics of how a job will be undertaken? - CORRECT ANSWER: Submittals

  • The construction industry has two common components to submittals which are:

_______ and ________. - CORRECT ANSWER: Shop drawings & Manufacturer's

product data sheet

127. Who provides shop drawings? - CORRECT ANSWER: Specialty contractors such

as: HVAC or Fire Safety

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The step-by-step guides offered by this document was a perfect resource for my project. A superb purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

RTPM Latest Update - 270 Questions and 100% Verified Correct Answers Guaranteed A+ 1. What are the two distinct processes of telecommunications project management? - CORRECT ANSWER: design and impl...

Unlock Now
$ 1.00