• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

sevendaysafterfinalgradeisreachedonanyportionofthesite;temporarysoil

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

1 / 36

VirginiaErosionandSedimentControl Inspector 1.permanentortemporarysoilstabilizationshallbeappliedtodenudedareaswithin sevendaysafterfinalgradeisreachedonanyportionofthesite;temporarysoil stabilizationshallbeappliedwithinsevendaystodenudedareasthatmaynotbeat finalgradebutwillremaindormantforlongerthan14days;permanentstabilization shallbeappliedtoareasthataretobeleftdormantformorethanoneyear 2.- - -

  • virginia erosion and sediment control inspector.pdffile:///C:/Users/HP/Desktop/New%20folder/virginia%20erosion%20a...

1 of 3612/16/, 5:44 AM 1 / 4

2 / 36

- - 4.duringconstruction,soilstockpilesandborrowareasshallbestabilizedorprotected withsedimenttrappingmeasures mulchpreventserosionbyprotectingthesurfacefromraindropimpactandsiltfence interceptsanddetainsfromdisturbedareas 5.permanentvegetationcovershallbeestablishedondenudedareasnototherwise permanentlystabilized(permanentvegetationshallnotbeconsideredestablished untilagroundcoverisachievedthatisuniform,matureenoughtosurvive,andwill inhibiterosion*thereisno%associatedwiththis*) reduceerosionanddecreasesedimentyieldfromdisturbedarea thisisthestandardusedtoverifythatasiteisreadyforreleaseofbondsorsurety virginia erosion and sediment control inspector.pdffile:///C:/Users/HP/Desktop/New%20folder/virginia%20erosion%20a...

2 of 3612/16/, 5:44 AM 2 / 4

3 / 36

6.Sedimentbasinsandtraps,perimeterdikes,sedimentbarriersandothermeasures intendedtotrapsedimentshallbeconstructedasafirststepinanyland-disturbing activityandshallbemadefunctionalbeforeupslopelanddisturbancetakesplace acertainamountofinitiallanddisturbancemayberequiredtoprovideaccessfor equipmenttoinstalltheperimetercontrols,butsiteclearingandgradingshouldbe virginia erosion and sediment control inspector.pdffile:///C:/Users/HP/Desktop/New%20folder/virginia%20erosion%20a...

3 of 3612/16/, 5:44 AM 3 / 4

4 / 36

kepttoaminimumuntiltheperimetercontrolsareinplace interceptsanddetainssmallamountsofsedimentfromdisturbedareasduring constructionoperationtopreventsedimentfromleavingthesiteanddecrease velocityofsheetflowsandlow-to-moderatelevelchannelflow 7.land-disturbingareaoncesiteclearing,grading,andconstructioncommences

Examples:siltfences,sedimenttraps,sedimentbasins,constructionentrance,

temporarydiversions,diversions 8.stabilizationmeasuresshallbeappliedtoearthenstructuressuchasdams,dikes,and diversionsimmediatelyafterinstallation reduceerosionandsedimentationandreducedamagefromsedimentandrunoffto downstreamoroff-siteareas virginia erosion and sediment control inspector.pdffile:///C:/Users/HP/Desktop/New%20folder/virginia%20erosion%20a...

4 of 3612/16/, 5:44 AM

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the comprehensive coverage in this document. It made learning easy. Truly superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

VirginiaErosionandSedimentControl Inspector 1. permanentortemporarysoilstabilizationshallbeappliedtodenudedareaswithin sevendaysafterfinalgradeisreachedonanyportionofthesite;temporarysoil stabiliza...

Unlock Now
$ 1.00