• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Solution and Answer Guide: Chapter 1: Introduction

Testbanks Dec 30, 2025 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

An Introduction to Management Science Quantitative Approaches to Decision Making, 16e David Anderson, Dennis Sweeney, Thomas Williams (Solutions Manual All Chapters)

(Download link at the end of this File)

  • / 4

Solution and Answer Guide: Chapter 1: Introduction 1 © 2022 Cengage. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.Solution and Answer Guide

Chapter 1: Introduction

Table of Contents Problems ........................................................................................................................................ 1 Case Problem: Scheduling a Youth Soccer League ................................................................... 12

Problems

  • Vocabulary. Define the terms management science and operations research. LO 1

Solutions:

Management science and operations research, terms used almost interchangeably, are broad disciplines that employ scientific methodology in managerial decision making or problem solving. Drawing upon a variety of disciplines (behavioral, mathematical, etc.), management science and operations research combine quantitative and qualitative considerations in order to establish policies and decisions that are in the best interest of the organization.

  • The Decision-Making Process. List and discuss the steps of the decision-making process. LO 2

Solutions:

  • Define the problem.
  • Identify the alternatives.
  • Determine the criteria.
  • Evaluate the alternatives.
  • Choose an alternative.
  • For further discussion, see Section 1.3.
  • Roles of Qualitative and Quantitative Approaches to Decision Making. Discuss the different
  • roles played by the qualitative and quantitative approaches to managerial decision making. Why is it important for a manager or decision maker to have a good understanding of both of these approaches to decision making? LO 2

Solutions:

See Section 1.2.

  • Production Scheduling. A firm just completed a new plant that will produce more than 500
  • different products, using more than 50 different production lines and machines. The production scheduling decisions are critical in that sales will be lost if customer demands are not met on time. If no individual in the firm has experience with this production operation and if new production schedules must be generated each week, why should the firm consider a quantitative approach to the production scheduling problem? LO 2 2 / 4

Solution and Answer Guide: Chapter 1: Introduction 2 © 2022 Cengage. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Solutions:

A quantitative approach should be considered because the problem is large, complex, important, new, and repetitive.

  • Advantages of Modeling. List the advantages of analyzing and experimenting with a model as
  • opposed to a real object or situation. LO 3

Solutions:

Models usually have time, cost, and risk advantages over experimenting with actual situations.

  • Choosing Between Models. Suppose that a manager has a choice between the following two
  • mathematical models of a given situation: (a) a relatively simple model that is a reasonable approximation of the real situation, and (b) a thorough and complex model that is the most accurate mathematical representation of the real situation possible. Why might the model described in part (a) be preferred by the manager? LO 3

Solutions:

Model (a) may be quicker to formulate, easier to solve, and/or more easy to understand.

  • Modeling Fuel Cost. Suppose you are going on a weekend trip to a city that is d miles away.
  • Develop a model that determines your round-trip gasoline costs. What assumptions or approximations are necessary to treat this model as a deterministic model? Are these assumptions or approximations acceptable to you? LO 3

Solutions:

Let d = distance m = miles per gallon c = cost per gallon,  Total Cost =2d c m







We must be willing to treat m and c as known and not subject to variation.

  • Adding a Second Product to a Production Model. Recall the production model from

Section 1.3:

Max 10x s.t.5x ≤ 40 x ≥ 0 Suppose the firm in this example considers a second product that has a unit profit of $5 and requires 2 hours of production time for each unit produced. Use y as the number of units of product 2 produced. LO 4

  • Show the mathematical model when both products are considered simultaneously.
  • Identify the controllable and uncontrollable inputs for this model.
  • Draw the flowchart of the input–output process for this model (see Figure 1.5).
  • What are the optimal solution values of x and y?
  • Is the model developed in part (a) a deterministic or a stochastic model? Explain. 3 / 4

Solution and Answer Guide: Chapter 1: Introduction 3 © 2022 Cengage. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Solutions:

  • Maximize 10x + 5y
  • s.t.5x + 2y ≤ 40 x ≥ 0, y ≥ 0

b. Controllable inputs: x and y

Uncontrollable inputs: profit (10,5), labor hours (5,2), and labor-hour availability (40) c.

  • x = 0, y = 20 Profit = $100
  • (Solution by trial-and-error)

  • Deterministic—all uncontrollable inputs are fixed and known.
  • Stochastic Production Models. Suppose we modify the production model in Section 1.3 to

obtain the following mathematical model:

Max 10x s.t.ax ≤ 40 x ≥ 0 where a is the number of hours of production time required for each unit produced. With a = 5, the optimal solution is x = 8. If we have a stochastic model with a = 3, a = 4, a = 5, or a = 6 as the possible values for the number of hours required per unit, what is the optimal value for x? What problems does this stochastic model cause? LO 4

  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document featured in-depth analysis that was incredibly useful for my research. Such an outstanding resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Testbanks
Added: Dec 30, 2025
Description:

An Introduction to Management Science Quantitative Approaches to Decision Making, 16e David Anderson, Dennis Sweeney, Thomas Williams (Solutions Manual All Chapters) (Download link at the end of th...

Unlock Now
$ 1.00