SWM DEQ UPDATED Exam (Actual / ) 141 Questions And 100% Verified CORRECT Answers
The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are greater than or equal to an acre
The Stormwater Management Act requires the State Water Control Board to permit, regulate, and control stormwater runoff
Representative inspections may not be used when utility line installation, pipeline construction, or other similar linear construction activities SWPPP inspection schedule discharge into impaired waters, surface waters with an applicable TMDL or exceptional waters
- / 3
The qualified personnel's SWPPP inspection report must included with the SWPPP no later than
- days following inspection
Corrective actions made based on inspections must be done as soon as practicable but no later than seven days, or a longer period of time as approved by the VSMP
Changes in the SWPPP must be made in a __ day period 7
For reports of unauthorized discharges, must notify DEQ upon discovery within a ___ window and a written report should be submitted within ___ of discovery of discharge 24 hours, 5 days
Concrete Wash Water must be directed into a leak-proof container or leak-proof settling basin
- / 3
Is the P2 plan approved by the VSMP authority?No
Are support activities covered under the Construction GP?Yes, if it meets specific criteria
If a Construction GP covers support activities do you have to inspect it?Yes
How long must a VSMP authority keep inspection reports?
- years
What are the three requirements for concrete wash water?Must be removed properly, must not overflow, put in a leak- proof basin
Stormwater BMPS use three primary mechanisms to control pollution infiltration, settling, vegetative uptake or filtering
- / 3