• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Test Bank for Performance

Testbanks Dec 29, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Test Bank for Performance Management 5 th Edition By Herman Aguinis (All Chapters 1-11, 100% Original Verified, A+ Grade) This is the Only Original Test Bank for 5 th Edition, All other Files in the Market are Fake/Old/Wrong Edition.All Chapters Arranged

Reverse: 11-1 1 / 4

Chapter 11 Chapter 11— Team Performance Management True/False Questions 11.1 A team is in place when two or more people interact dynamically and interdependently and share a common and valued goal, objective, or mission.

(Suggested points: 2, [11.1]); Pg. 321

LO: 1

Answer:

True.

11.2 Teams must be made permanent and reside in the same geographical location.

(Suggested points: 2, [11.1]); Pg. 322

LO: 1

Answer:

False. Teams do not have to be permanent and team members do not have to be in the same geographic location. In fact, team members do not need to have met in person to be members of the same team. As long as they work together, they need one another, and they share common goals, they are considered to be members of the same team.

11.3 Teams are used as a possible way to improve products and services and increase productivity.

(Suggested points: 2, [11.2]); Pg. 324

LO: 1

Answer:

True.

11.4 In organizations using teams, the performance management system should only focus on team performance and contributions.

(Suggested points: 2, [11.1]); Pg. 322

LO: 4

Answer:

False. Specifically, the system should target not only (1) individual performance but also (2) an individual’s contribution to the performance of his or her team(s) and (3) the performance of teams as a whole.

11.5 Routine tasks are well-defined, there are few deviations in how the work is done, and outcomes are easily assessed once the task is completed.

(Suggested points: 2, [11.2]); Pg. 323

LO: 2

Answer:

True.

11.6 Project teams are considered teams that are assembled for a specific purpose and expected to disband once the specific tasks are completed.419

. 2 / 4

Part IV: Reward Systems, Legal Issues, and Team Performance Management

(Suggested points: 2, [11.2]); Pg. 324

LO: 2

Answer:

True.

11.7 Team performance management must consider the type of team in question before performance measures are put in place.

(Suggested points: 2, [11.2]); Pg. 324

LO: 2

Answer:

True.

11.8 Organizations that choose to include a team component in their performance management systems do not have to be concerned with assessing individual contributions.

(Suggested points: 2, [11.5]); Pg. 327

LO: 5

Answer:

False. In general, organizations that choose to include a team component in their

performance management systems face the following challenge: How do we

assess relative individual contribution.

11.9 Having good knowledge of the organization’s mission and having good knowledge of the job in question are two prerequisites of the first component of the performance management process.

(Suggested points: 2, [11.4]); Pg. 329

LO: 6

Answer:

True.

11.10 The second component of the performance management process involves identifying rewards.

(Suggested points: 2, [11.4]); Pg. 332

LO: 6

Answer:

False. The second component of the performance management process involves performance planning.

11.11 Autonomous teams are solely responsible for performance execution.

(Suggested points: 2, [11.4]); Pg. 332

LO: 6

Answer:

True.

11.12 During the performance assessment of the performance management system, team members are the only people who evaluate the performance of the team.

. 3 / 4

Chapter 11

(Suggested points: 2, [11.4]); Pg. 334

LO: 6

Answer:

False. All team members must evaluate one another’s performance as well as the performance of the team overall.

11.13

Three types of performance should be assessed: task performance, contextual

performance, and team performance as a whole.

(Suggested points: 2, [11.4]); Pg. 335

LO: 6

Answer:

True.

11.14 Effectiveness is the degree to which results satisfy team stakeholders, including both internal and external customers.

(Suggested points: 2, [11.4]); Pg. 335

LO: 6

Answer:

True.

11.15 The fundamental principles guiding the design and implementation of a performance management system for a team are different from those for individuals.

(Suggested points: 2, [11.4]); Pg. 328

LO: 1

Answer:

False. The fundamental principles guiding the design and implementation of a performance management system are the same as those for individuals; the process is more complex.

11.16 Team members are responsible for being prepared for the team performance review by conducting regular peer appraisals.

(Suggested points: 2, [11.4]); Pg. 336

LO: 6

Answer:

True.

11.17 Unlike individual rewards, team rewards should be applicable to all employees, visible, contingent, and irreversible.

(Suggested points: 2, [11.5]); Pg. 337

LO: 8

Answer:

False. Team rewards should also be applicable to all employees, visible, contingent, and irreversible.421 .

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its step-by-step guides, this document made learning easy. Definitely a impressive choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Testbanks
Added: Dec 29, 2025
Description:

Test Bank for Performance Management 5 th Edition By Herman Aguinis (All Chapters 1-11, 100% Original Verified, A+ Grade) This is the Only Original Test Bank for 5 th Edition, All other Files in t...

Unlock Now
$ 1.00