IADC WellSharp Well Servicing – Workover Well Control Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the main objective of well control during workover operations?
a) To increase reservoir production
b) To maintain hydrostatic pressure balance
c) To prevent uncontrolled flow of formation fluids
d) To reduce rig downtime
Rationale: The purpose of well control is to prevent any influx or blowout
by keeping formation fluids contained within the wellbore.
- What is the hydrostatic pressure at 6,000 ft with a mud weight of 9.5
- 2,800 psi 1 / 4
ppg?
- 2,700 psi
- 2,970 psi
- 3,150 psi
Rationale: Hydrostatic pressure = 0.052 × MW × TVD = 0.052 × 9.5 × 6000 =
2,964 psi ≈ 2,970 psi.
- What is the most likely cause of a kick during workover operations?
a) Excessive choke pressure
b) Low annular pressure
c) Insufficient hydrostatic head
d) Gas migration
Rationale: When mud hydrostatic pressure drops below formation
pressure, formation fluids enter the wellbore causing a kick.
- What component is primarily used to close the well in an emergency?
a) Choke manifold
b) Kill line
c) Blowout Preventer (BOP)
d) Kelly valve
Rationale: The BOP is the primary well control device used to seal the
wellbore and stop flow.
- / 4
- What is the primary purpose of the annular preventer?
a) To provide secondary pressure control
b) To act as a circulating valve
c) To seal around various pipe sizes or open hole
d) To equalize pressure between annulus and tubing
Rationale: Annular preventers are versatile and can seal around any
tubular or open hole.
- What pressure reading indicates a possible influx?
a) Increase in standpipe pressure
b) Decrease in tubing pressure
c) Increase in casing pressure
d) Constant tubing pressure
Rationale: A sudden rise in casing pressure suggests formation fluids
entering the well.
- The difference between formation pressure and hydrostatic pressure is
known as:
a) Differential pressure
b) Overbalance
c) Underbalance
d) Kick tolerance 3 / 4
Rationale: Overbalance exists when mud pressure exceeds formation
pressure, maintaining well control.
- What happens when hydrostatic pressure is lower than formation
pressure?
a) Well is killed
b) Lost circulation
c) Kick occurs
d) Gas lock
Rationale: An underbalanced condition allows fluids to enter the wellbore,
causing a kick.
- What type of fluid is commonly used for workover well control
operations?
a) Cement
b) Crude oil
c) Brine or completion fluid
d) Diesel
Rationale: Brine or completion fluids are used due to compatibility and
ability to control pressure.
- / 4