Nccco signal person test and Answers
continuously - ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - ANSWER-according to asme b30.5 prior to qualifying all signal persons they must be tested by?none - ANSWER-what should be the response of the operator if the signal is not understood posted conspicuously - ANSWER-according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - ANSWER-when using voice signals according to asme b30.5 who must be present for the pre lift discussion 1 / 2
2 ....COPYRIGHT ©️
limitations - ANSWER-a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - ANSWER-according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other - ANSWER-prior to commencing a crane lift the operator and signalperson shall perspective - ANSWER-any direction given to the crane operator by the signal person shall be given from the operator function and direction - ANSWER-what is the first element of voice signals given to a crane operator prior to the lift three - ANSWER-according to osha and asme b30.5 each series of voice signals contain how many elements lift director - ANSWER-for lifting operations using voice signals who has the responsibility of permitting multiple simultaneous crane functions standard signals - ANSWER-according to asme b30.5 special signals cannot conflict with back up - ANSWER-if the operator sounds three short audible signals while loving the crane he/she intends to
- / 2