Chapter 1
1.1. g
1.2. d
1.3. a
1.4. b
1.7. b
1.8. b
1.9. a
1.10. a
1.11. c
1.13. a, c, e
1.14. b
1.15. b
1.16. b
1.17. c
1.19. Transportation sector, building sector, and industrial sector.
1.20. Commercial and residential sectors
1.23. d
1.24. d
1.28. b
1.33.• Electric power sector • Natural gas Solutions Manual for Power Plant Engineering, 1e by Farshid Zabihian (All Chapters) 1 / 4
• Electricity • Natural gas
• 12+17=29%
• 8+43=51%
• 100-70=30%
• 100-7-2=91%
1.34.• Electric Power Sector • Industrial • Residential • Commercial • Transportation 1.35.• Electric Power Sector • Industrial • Commercial 1.36.• Transportation • Industrial • Residential • Commercial • Electric Power Sector
- / 4
1.37.• Electric Power Sector • Industrial • Transportation • Residential • Commercial
1.38. a
1.39. a
1.40. a
1.41. a
1.42. b
1.46. h, c, e, g, f, b, a, d
1.47. a
1.55. a
1.58. a, b, c, d
1.59. a
1.61. a
1.62. a
1.63. a
1.64. a
1.66. b
1.67. a
1.68. b 3 / 4
1.69. a
1.72. a
1.73. b
1.74. b
1.77. a
1.79. d
1.80. b
1.81. b
1.82. a
1.84. b
1.85. a
1.89. b
1.91. a
1.93. a
1.96. d
1.97. a
1.99. d
1.104. e
1.105.
Actual electrical energy produced = 150,000 MWh Maximum possible electrical energy = 2000 MW * 24 hour/day * 365.25 = 17,532,000 MWh Capacity factor = 150,000 / 17,532,000 = 0.00856 = 0.856%
1.107. b