7/16/25, 12:23 AM NCCCO MOBILE CRANE
/ 1/22
NCCCO MOBILE CRANE ACTUAL EXAM -
\LATEST UPDATE \COMPLETE QUESTIONS AND
CORRECT DETAILED ANSWERS \ASSURED PASS
ALREADY GRADED PASS \GRADED A+
Terms in this set (99)
- What action does a signal
- Boom down
- Swing
- Boom up
- Extend boom
- When hoisting personnel,
- 1%
- 2%
- 5%
- 8%
- 1 / 3
person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up?
c.
within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid?
7/16/25, 12:23 AM NCCCO MOBILE CRANE
/ 2/22
- The load line of the crane
- Climb down carefully from
- Jump down, feet together
- Stay in the cab until the
- Get as far away from
- According to OSHA
- 1 broken wire in 6 rope
- 2 broken wires in 30 rope
- 3 broken wires in one
- 2 broken wires in 6 rope
- What is the net capacity
- The capacity listed in
- The capacity listed in the
- 2 / 3
you're operating contacts an energized power line.There's no sign of any other danger, such as fire.What should you do?
the crane cab
lines are de- energized
the crane as possible c.
1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope?
diameters
diameters
strand in one lay
diameters d.
of a crane on main boom unless the manufacturer states otherwise?
the load chart minus the weight of the rigging and all attachments
load chart plus the weight of the rigging and all attachments
7/16/25, 12:23 AM NCCCO MOBILE CRANE
/ 3/22
- The capacity listed in
- The capacity listed in
- What may happen to a
- It could swing out away from
- It could swing in towards the
- It could raise absolutely
- It could shift in its rigging
- What Standard Method
the load chart minus the weight of the rigging and all attachments not in use
the load chart minus the weight of the rigging alone
properly rigged load when lifted off the ground unless the operator takes account of boom deflection?
the crane
crane
vertically
a.
hand signal is being illustrated?
- Swing
- Stop
- Emergency Stop
- Travel
- Who should an operator
- Appointed signal person
- Project manager only
- Superintendent only
- Anyone
- / 3
a.
respond to a "stop" signal from?
only