• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

A. OSHA 29 CFR 1910 - License Exam Practice Exam 100 Questions And Co...

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

North Carolina Highway Contractor License Exam Practice Exam 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • The primary reference manual for NC Highway Contractor Exam

questions is:

A. OSHA 29 CFR 1910

  • NCDOT Standard Specifications for Roads and Structures

C. ACI 318

  • EPA Water Quality Handbook

Rationale: The exam is based heavily on NCDOT specifications and

standards.

  • Asphalt compaction should generally be completed before the mix

cools below:

A. 300°F 1 / 3

B. 175°F

C. 125°F

D. 200°F

Rationale: Below 175°F asphalt becomes too rigid for proper

compaction.

3. The subgrade for a highway project must be tested for:

  • Alkali-silica reaction
  • Traffic marking compatibility
  • Density and moisture content
  • Concrete slump

Rationale: Stable density and moisture ensure proper load-bearing

capacity.

4. The purpose of a tack coat between asphalt layers is to:

  • Waterproof the pavement
  • Bond layers together
  • Strengthen subgrade
  • Reduce temperature

Rationale: Tack coat creates adhesion between asphalt lifts.

5. A Type III barricade is used primarily for:

  • Minor lane shifts
  • Pedestrian safety only
  • Horizontal alignment warnings
  • Road closures 2 / 3

Rationale: Type III barricades indicate full roadway closure or

blockage.

6. Concrete curing is important to prevent:

  • Asphalt rutting
  • Premature cracking and low strength
  • Reflective cracking
  • Aggregate segregation

Rationale: Proper curing maintains moisture needed for hydration

and strength gain.

  • Which organization sets work zone traffic control standards?

A. FHWA

B. MUTCD

C. AASHTO

D. NIOSH

Rationale: MUTCD governs signs, barricades, and traffic control

methods.

8. In slope stabilization, riprap is primarily used to prevent:

  • Subgrade expansion
  • Asphalt bleeding
  • Erosion from water flow
  • Concrete scaling
  • Rationale: Riprap protects slopes from scour and erosion.

  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document provided in-depth analysis, which was a perfect resource for my project. Absolutely impressive!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

North Carolina Highway Contractor License Exam Practice Exam 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. The primary reference manual for...

Unlock Now
$ 1.00