- What is the primary purpose of a slump test?
- Determine air content of concrete
- Measure the compressive strength of concrete
- Determine the consistency or workability of fresh concrete
- Evaluate the water-cement ratio
Rationale: The slump test measures the workability of fresh concrete,
indicating its consistency for placement and finishing.
- When performing a slump test, what is the correct procedure for
- Fill in one layer without tamping 1 / 4
filling the cone?
- Fill in three layers, each tamped 25 times with a rod
- Fill in two layers, tamping 50 times each
- Fill completely, then shake the cone
Rationale: Standard practice involves filling the slump cone in three
layers and tamping each layer 25 times to consolidate the concrete properly.
- The air content of freshly mixed concrete can be measured by which
- Slump test
- Pressure or volumetric method
- Compressive strength test
- Temperature test
method?
Rationale: Air content is determined using either pressure-type or
volumetric air meters for fresh concrete.
- What is the minimum number of specimens required to determine
- 1
- 2
- 3
- 4
compressive strength for a single test age?
Rationale: ACI requires at least three specimens to provide reliable
strength results for a given test age. 2 / 4
- Which type of aggregate is more likely to produce concrete with lower
- Lightweight aggregate
- Dense, well-graded coarse aggregate
- Rounded gravel
- Recycled aggregate
shrinkage?
Rationale: Dense and well-graded aggregates reduce the overall
paste content and shrinkage of concrete.
- Which factor has the greatest effect on the workability of concrete?
- Aggregate shape
- Aggregate gradation
- Water content
- Curing temperature
Rationale: Water content directly affects workability; more water
increases slump and ease of placement.
- When sampling concrete from a truck mixer, the sample should be
taken:
- From the first load discharged
- From several portions discharged during continuous operation
- Only from the center of the drum
- Only from the surface
Rationale: A representative sample requires portions from different
areas during discharge to ensure homogeneity. 3 / 4
- Which tool is required to finish a freshly placed concrete surface?
- Trowel
- Float
- Screed
- All of the above
Rationale: Screeds level, floats smooth, and trowels finish the
surface; all tools are used for proper finishing.
- Which of the following is a common defect caused by rapid drying of
- Honeycombing
- Plastic shrinkage cracks
- Segregation
- Bleeding
concrete?
Rationale: Rapid moisture loss in fresh concrete can cause plastic
shrinkage cracks on the surface.
- During temperature measurement of fresh concrete, the
thermometer should be placed:
- On the surface
- At the center of the mass
- Near the edge of the form
- In a separate water container
Rationale: The center of the mass provides a representative
temperature of the concrete.