• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

and Answers 100 Pass

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Telescopic Boom Crane- Fall

and Answers 100% Pass To provide protection in the cranes work area, barriers MUST be erected in accessible areas; - Answer>>Within the equipment's rotating structure All of the following can cause a two-block condition

except: - Answer>>Raising the boom

When rotation of load may be hazardous, the operator must - Answer>>Ensure tag line is used According to OSHA 1926 Subpart cc, which of the following individuals is not allowed within the fall zone? - Answer>>Qualified evaluator The term that is used to define the load plus all rigging

components, hooks, blocks and lifting equipment is: -

Answer>>Gross load According to OSHA 1926 Subpart CC, the minimum distance that must be maintained between a working

crane, load or load line and an 8kV power line is: -

Answer>>10ft What is the sum of the following deductions? Block 1250lbs, Rigging 23lbs, Spreader beam 350lbs - Answer>>1623lbs 1 / 2

When a crane is set up to close to a new building, expect

the ground to be: - Answer>>Soft

A vertical basket hitch is rated at what percentage of a vertical hitch? - Answer>>200% When is the hoist line on top of the boom considered part of the load? - Answer>>It is not considered When a heavy load is lifted, what is the result? - Answer>>Boom deflection According to OSHA 1926 Subpart CC, for cranes traveling with no load, what is the minimum clearance for energized power lines at 40kV? - Answer>>6ft Wich of the following rigging configurations is listed in order of the strongest to weakest? - Answer>>Basket, Vertical, Choker According to OSHA 1926 Subpart CC, how many randomly distributed broken wires in rotation resistant wire rope are cause for replacement? - Answer>>2 broken wires in 6 rope diameters What site conditions must an operator be concerned about prior to setting up a crane? - Answer>>Soil stability must be sufficient

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The comprehensive coverage offered by this document enhanced my understanding. A remarkable purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO Telescopic Boom Crane- Fall and Answers 100% Pass To provide protection in the cranes work area, barriers MUST be erected in accessible areas; - Answer>>Within the equipment's rotating struct...

Unlock Now
$ 1.00