• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Answers 100 Pass - Cab (TSS) Mobile Crane NCCER Fall Answers 100% ...

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Telescopic Boom Crane - Fixed Cab (TSS) Mobile Crane NCCER Fall

Answers 100% Pass In a two crane lift the center of gravity should be - Answer>>Closer to the crane with the greatest capacity For rubber-tired cranes working on rubber, the part of the load chart governed by stability is based on what % of the crane's capacity? - Answer>>75% As a general rue on tandem crane lifts neither crane should be loaded greater than what % of net capacity - Answer>>75% On long boom cranes, what is the major effect of abruptly stopping a rapid swing? - Answer>>Action may overturn the crane or collapse the boom The most important thing to remember when performing dual

crane lifts is: - Answer>>The cranes should not be loaded

beyond 75% of their rated capacity The total weight of a loaded personnel platform and related rigging shall not exceed what % of the rated capacity for the radius and configuration of a crane or derrick - Answer>>50%

Pre-operational inspections are necessary and required: -

Answer>>Enhance cranes safety by discovering discrepancies prior to operating. 1 / 2

If a crane has to be level to within 1% of grade, the maximum allowable variation in grade in a horizontal distance of 20' would

be: - Answer>>2.4''

On a standard running rope, how many broken wires are cause for considering replacement? - Answer>>3 broken wires in one strand in one lay On a standing rope, how many wires need to be broken at an end connections before replacing? - Answer>>2 According to ASME B30.5, mobile crane standard, how many randomly distributed broken wires in rotation- resistant- rope is cause for considering replacement of the rope? - Answer>>2 broken wire in 6 rope diameters The lay length of a wire rope is defined as - Answer>>Distance of one strand as it makes one revolutions which of the following signifies the grade of steel used in wire rope? - Answer>>XIP (Extra Improved Plow Steel) Which end fitting has the highest efficiency rating? - Answer>>Swaged Sockets Which hitch provides the greatest lifting capacity? - Answer>>Basket Hitch

When placing a shackle on a crane hook the correct procedure is:

  • Answer>>Place the shackle pin in the hook
  • Its time to replace wire rope when_______% of the diameter of outside wire is worn away? - Answer>>5%

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The in-depth analysis offered by this document helped me ace my presentation. A remarkable purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO Telescopic Boom Crane - Fixed Cab (TSS) Mobile Crane NCCER Fall Answers 100% Pass In a two crane lift the center of gravity should be - Answer>>Closer to the crane with the greatest capacity ...

Unlock Now
$ 1.00