Before each climbing operation all load members of the support system shall be - Inspected answer>>
ON Site Where should climbing instructions be kept - answer>>
Daily Hydraulic systems should have their proper fluid level checked - answer>>
If load is undetermined who is to find out if load weight does not exceed crane Person responsible for rating at radius at which the load is to be lifted - answer>> lift
Do your If power fails during operations, the following shouldn't apply - answer>> best to finish moving load where it was designated to go
Smooth Joints Splices in rall tracks shall have - answer>>
All climbing operations shall be performed under the supervision of - Qualified person answer>>
When cranes are erected, load limiting devices shall be tested for proper setting Before crane is placed in serviceand operation - answer>> 1 / 3
Hooks shall be equipped with latches unless the application makes the use of the Impractical latch - answer>>
Size and position of signs or panels must satisfy the limitations of - Manufacturer answer>>
Fall prevention measures are needed for working at locations where you are To a fall of 6ft or more exposed - answer>>
than 14 inches from Travel distance on hand levers shall not be greater - answer>> neutral position
For power lines rated 175KV the minimum clearance between the lines and any >>15ft part of the crane or load is - answer
start of new shift All controls shall be tested by the operator at the - answer>>
ID tagged Chain slings are required to be - answer>>
Welding on loads suspended by the crane can only be done if the load has - Insulated slings answer>>
>>4,000 lbs How much does an average cubic yard of concrete weight - answer 2 / 3
At base of crane Main power switch for tower crane is - answer>>
>>Hydraulic Items not listed in the frequent inspection checklist are - answer pumps and valves for excessive wear or damage
When is it necessary to determine that there is no practical alternative way to >>Personnel Lift perform the needed work or to gain access to the area - answer
Each series of voice signals shall contain three elements stated in the following Function and Direction - Distance and speed - Function stop order - answer>>
When lifting personnel communication shall be maintained between three of the Person(s) being lifted - Operator - Signal person next four - answer>>
The condition when the tower load block or hook assembly comes in contact with Two-blocking the upper - answer>>
Load bearing members of the climbing and support system shall be inspected Climbing operation before each - answer>>
At or near Where shall a wind velocity indicating device be mounted - answer>> the top of crane
- / 3