©BRIGHTSTARS EXAM SOLUTIONS
10/22/ 12:14 PM
Nccco Signal person Test Questions And Answers .
Continuously - answer✔during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - answer✔if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - answer✔OSHA's standard method crane hand signals would be located in the following designated person - answer✔according to asme b30.5 prior to qualifying all signal persons they must be tested by?none - answer✔what should be the response of the operator if the signal is not understood posted conspicuously - answer✔according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - answer✔when using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations - answer✔a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - answer✔according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other - answer✔prior to commencing a crane lift the operator and signalperson shall perspective - answer✔any direction given to the crane operator by the signal person shall be given from the operator function and direction - answer✔what is the first element of voice signals given to a crane operator prior to the lift 1 / 2
©BRIGHTSTARS EXAM SOLUTIONS
10/22/ 12:14 PM
three - answer✔according to osha and asme b30.5 each series of voice signals contain how many elements lift director - answer✔for lifting operations using voice signals who has the responsibility of permitting multiple simultaneous crane functions standard signals - answer✔according to asme b30.5 special signals cannot conflict with back up - answer✔if the operator sounds three short audible signals while loving the crane he/she intends to stop - answer✔if the operator sounds one short audible signal while moving the crane he/she intends to job site location - answer✔according to asme b30.5 ant audible emergency signal must be agreed upon at each go ahead - answer✔if the operator sounds two short audible signals while move crane he/she intends to hard wire radio - answer✔when signaling a tower crane which of the following is most reliable asme b30.3 - answer✔according to asme which volume listed below must be used to hand signal a tower crane asme b30.5 - answer✔according to asme which volume listed below must be used to hand signal a mobile crane 10 feet w/encroachment precautions - answer✔according to osha 1926.1408 the minimum clearance between any part of the crane and power lines 50kv or below shall be 10 feet w/encroachment precautions - answer✔according to osha 1926.1408 for power lines 100kv the minimum clearance between the crane and any lines shall be
- - answer✔osha 1926.1411 when you encounter power lines with a voltage of 44kv and the
- / 2
crane is in transit you must keep a minimum clearance of how many feet 10 - answer✔according to osha 1926.1411 when the crane is in transit and the power lines you are to go under are at 300kv what minimum clearance must you maintain signal person - answer✔osha 1926.1401 a dedicated spotter must also have the qualifications of a utility owner/operator - answer✔overheard power lines shall be considered energized authorization that the lines are deenergized must be given by whom