Which of the following documents would typically not be produced during the schematic design phase of the Project's design stage?
- Sketches
- Outline specifications
- Models
- Preliminary project descriptions - Correct Answer - B. Outline
specifications
Allowances, alternates, and unit prices are used to control all of the
following except:
- Indeterminate items
- Postponement of decisions
- Contractor selection
- Construction costs - Correct Answer - C. Contractor selection
In a specification section, all of the following are Articles in "Part 1 -
General" except:
- References
- Submittals 1 / 4
- | P a g e
pg. 2
- Source Quality Control
- Administrative Requirements
- Field Conditions
- Warranties - Correct Answer - C. Source Quality Control
Which of the following is not an alternative term for project conception?
- Programming
- Pre-design
- Design development
- Needs assessment - Correct Answer - C. Design development
Which of the following is an untrue statement about project programming?
- Project goals and problem statements are established
B. Four concepts include: form, function, time, economy
- Construction drawings are completed
D. Five steps include: establish goals, collect and analyze facts,
understand and test concepts, determine needs, state the problem - Correct Answer - C. Construction drawings are completed
The Procurement Documents include all of the following except:
- Procurement Requirements
- Contract modifications
- Project manual 2 / 4
- | P a g e
pg. 3
- Drawings - Correct Answer - B. Contract modifications
Which of the following is not part of the Contract Documents?
- Agreement
- Procurement forms
- Contract modifications
- Performance Bond
- Addenda - Correct Answer - B. Procurement forms
A facility's life cycle includes all of the following except:
- Project Conception
- Financing
- Construction
- Facility Management - Correct Answer - B. Financing
A construction manager is hired by the Owner to do all of the following
except:
- Assist in procuring the contractor
- Administer the project
- Provide observation services at the construction site
- Supervise the A/E - Correct Answer - D. Supervise the A/E
Which of the following is in the proper order, relative to the construction stage? 3 / 4
- | P a g e
pg. 4
- Claim, mediation, binding arbitration
- Change order, litigation, mediation, arbitration
- Dispute, change order, termination
- Termination, binding arbitration, dispute review board, change order -
Correct Answer - A. Claim, mediation, binding arbitration
What activities help the Owner define specific needs and identify existing conditions and future trends?
- Prequalification of bidders
- Feasibility studies
- Contract negotiations
- Competitive bidding - Correct Answer - B. Feasibility studies
The Agreement defines the relationships and basic obligations between
the:
- Owner and Contractor
- Owner, A/E, Contractor, and surety
- A/E and Contractor
- Owner, Contractor, subcontractor, and material Suppliers - Correct
Answer - A. Owner and Contractor
Which of the following is not one of the types of commissioning recognized by CSI?
- Commissioning a naval vessel
- Equipment and system commissioning