• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Certification Exam Latest Update

NCCCO Examination Dec 15, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Tower Crane Operator Certification Exam (Latest Update

Verified Answers | Grade A | 100% Correct

Question:

The preferred method of contact between signal person and operator is by

Answer:

hard wire voice communication

Question:

If the jibs of two adjacent tower cranes can overlap, which of the following conditions should apply

Answer:

jibs set at different heights, operators have voice contact, one person organizing hoisting operations...all of above

  • / 4

Question:

T or F The jib of an unattended tower crane is locked in position and never allowed to weathervane with the wind

Answer:

false

Question:

T or F A tower crane used regularly and in good working condition only requires inspection every 6 months

Answer:

false

Question:

When the tower base bolts are re-torqued, the jib is rotated so the counterweight is positioned in what position relating to the bolts being tightened?

Answer:

counterweight over the bolts

  • / 4

Question:

Splices in rall tracks shall have

Answer:

Smooth Joints

Question:

Hydraulic systems should have their proper fluid level checked

Answer:

Daily

Question:

If power fails during operations, the following shouldn't apply

Answer:

Do your best to finish moving load where it was designated to go

Question:

If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted

Answer:

Person responsible for lift 3 / 4

Question:

Where should climbing instructions be kept

Answer:

ON Site

Question:

All climbing operations shall be performed under the supervision of

Answer:

Qualified person

Question:

When cranes are erected, load limiting devices shall be tested for proper setting and operation

Answer:

Before crane is placed in service

Question:

Hooks shall be equipped with latches unless the application makes the use of the latch

Answer:

Impractical

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The comprehensive coverage offered by this document helped me ace my presentation. A outstanding purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: NCCCO Examination
Added: Dec 15, 2025
Description:

NCCCO Tower Crane Operator Certification Exam (Latest Update Verified Answers | Grade A | 100% Correct Question: The preferred method of contact between signal person and operator is by Answer: har...

Unlock Now
$ 1.00