pg. 1
CERTIFICATION EXAM WITH 300 REAL EXAM
QUESTIONS AND CORRECT ANSWERS/ NCCO
MOBILE CRANE OPERATOR CERTIFICATION
TEST PREP / (NEW!!)
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER-Keeping 90 degree angle between cylinder rod and pad
How many randomly broken wires in a lay length must there be on a mobile crane hoist line, before it should be removed from service? - ANSWER-6
On a mobile crane, how many broken wires are permitted at the end connection of a pendent before it must be taken out of service? - ANSWER-1
Type 1 rotation resistant hoist wire rope has a design factor of: - ANSWER-5 to 1
Mobile cranes that are set up on barges, shall have a list chart provided by which of the entities listed below? - ANSWER-Manufacturer
When lifting loads on tires, mobile cranes are rated at what percentage of tipping? -
ANSWER-75%
- What action does a signal person intend the operator to perform if he extends his
- Boom down 1 / 4
arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up?
pg. 2
- Swing
- Boom up
- Extend boom - ANSWER-c.
- According to ASME B30.5, what are the minimal requirements to meet crane
- High School Diploma
- CDL with on the job training
- Physical, Written Test, Practical Test
- CDL physical, employers written permission - ANSWER-c.
operator qualifications?
- The load line of the crane you're operating contacts an energized power line.
- Climb down carefully from the crane cab
- Jump down, feet together
- Stay in the cab until the lines are de-energized
- Get as far away from the crane as possible - ANSWER-c.
There's no sign of any other danger, such as fire. What should you do?
- According to OSHA 1926.1413, how many randomly distributed broken wires
- 1 broken wire in 6 rope diameters
- 2 broken wires in 30 rope diameters
- 3 broken wires in one strand in one lay
- 2 broken wires in 6 rope diameters - ANSWER-d.
- / 4
in rotation-resistant rope are cause for replacement of the rope?
pg. 3
- What is the net capacity of a crane on main boom unless the manufacturer states
- The capacity listed in the load chart minus the weight of the rigging and all
- The capacity listed in the load chart plus the weight of the rigging and all
- The capacity listed in the load chart minus the weight of the rigging and all
- The capacity listed in the load chart minus the weight of the rigging alone -
otherwise?
attachments
attachments
attachments not in use
ANSWER-a.
- What may happen to a properly rigged load when lifted off the ground unless the
- It could swing out away from the crane
- It could swing in towards the crane
- It could raise absolutely vertically
- It could shift in its rigging - ANSWER-a.
operator takes account of boom deflection?
- What Standard Method hand signal is being illustrated?
- Swing
- Stop
- Emergency Stop
- Travel - ANSWER-a.
- Who should an operator respond to a "stop" signal from?
- Appointed signal person only 3 / 4
pg. 4
- Project manager only
- Superintendent only
- Anyone - ANSWER-d.
- Which area do truck cranes without a 5th outrigger generally have no lifting
- The side
- The rear
- The front
- The outriggers - ANSWER-c.
capacity unless the manufacturer states otherwise?
- What is the definition of "operating radius?"
- The distance from the base of the boom to the center of the load b. The distance
- The distance from the center of rotation of the crane to the center of the load
- The distance from the center of rotation of the crane to the center of gravity of
from the front of the crane to the center of gravity of the load
the load - ANSWER-d.
- What applies to the capacities below the bold line shown on a load chart?
- They are based on the structural strength of the crane
- They must not be used
- They are based on the stability of the crane
- They should only be used if the crane is set up on outriggers - ANSWER-c.
- In which quadrant are rough terrain crane capacities generally greater?
- Over the front
- / 4