ACI Concrete Transportation Inspector Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the primary role of a Concrete Transportation Inspector?
- To supervise the batching of concrete
- To ensure concrete is transported, handled, and placed according to
- To design concrete mix proportions
- To test aggregates in the lab
specifications
Rationale: The inspector ensures concrete is handled properly during
transportation to maintain quality and compliance with project specifications.
- / 4
2. The most critical factor affecting concrete quality during transport is:
- Truck driver’s skill
- Time between batching and placement
- Truck color
- Route taken
Rationale: The longer the transport time, the greater the risk of loss of
workability and premature setting.
3. ASTM C94 limits the time between batching and discharge to:
- 60 minutes
- 90 minutes
- 120 minutes
- 45 minutes
Rationale: ASTM C94 specifies 90 minutes unless a different time is
permitted by the purchaser.
- The inspector should verify that the drum of a ready-mix truck makes how
- 20
many revolutions before discharge?
B. 70–100
- 10
D. 50–60 2 / 4
Rationale: Proper mixing requires 70–100 revolutions at mixing speed to
achieve uniformity.
5. When water is added to the concrete at the jobsite, the inspector must:
- Ignore it
- Record the amount and ensure it doesn’t exceed water-cement ratio
- Allow any addition needed for workability
- Restart mixing from scratch
limits
Rationale: The inspector must ensure that added water maintains
compliance with the approved mix design and w/cm ratio.
6. The correct slump test standard is:
A. ASTM C231
B. ASTM C138
C. ASTM C143
D. ASTM C31
Rationale: ASTM C143 covers the slump test method for measuring
concrete consistency.
7. The temperature of concrete is measured according to:
A. ASTM C31 3 / 4
B. ASTM C138
C. ASTM C1064
D. ASTM C143
Rationale: ASTM C1064 specifies methods for measuring fresh concrete
temperature.
- The inspector observes that concrete has segregated during transport.
The best action is to:
- Remix briefly at high speed
- Reject the load
- Add water to restore flow
- Discharge anyway
Rationale: Segregation indicates improper handling or excessive
vibration—such concrete should be rejected.
- A concrete truck should discharge within how many revolutions after
mixing?
A. 100
B. 300
C. 150
D. 400
Rationale: ASTM C94 states discharge should be completed before 300
revolutions of the drum.