Formwork & Shoring Technician Certification Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the primary purpose of formwork in concrete construction?
- To reinforce concrete
- To shape and support fresh concrete until it attains sufficient
- To provide decorative finish
- To reduce concrete curing time
strength
Rationale: Formwork is used to mold and support fresh concrete until
it can support its own weight.
- Which type of formwork is most suitable for high-rise structures?
- Timber formwork
- Steel formwork 1 / 4
- Plywood formwork
- Plastic formwork
Rationale: Steel formwork is strong, durable, and reusable, making it
ideal for repetitive high-rise construction.
- What is the minimum concrete cover required over reinforcement in a
- 10 mm
- 15 mm
- 25 mm
- 40 mm
slab exposed to weather?
Rationale: Adequate concrete cover protects steel reinforcement
from corrosion and fire.
- Which property of formwork material is most critical for heavy-load
- Color
- Flexibility
- Strength
- Weight
structures?
Rationale: Strength is critical to safely support fresh concrete loads
without failure.
5. When shoring, the vertical members must be:
- Plumb and properly braced
- Tilted slightly for drainage 2 / 4
- Spaced randomly
- Unbraced for flexibility
Rationale: Vertical members must be plumb and braced to safely
transfer loads to the foundation.
- What is the main advantage of modular formwork?
- Single-use only
- High labor requirements
- Faster assembly and reuse
- Heavy and difficult to move
Rationale: Modular formwork allows rapid assembly and
disassembly and can be reused multiple times.
- What should be done before removing formwork from a concrete
- Remove immediately after pouring
- Wait 24 hours regardless of conditions
- Ensure concrete has attained sufficient strength
- Pour more concrete to reinforce
slab?
Rationale: Removing formwork too early may cause structural
damage or collapse.
- Which type of shoring is temporary and removed after concrete
- Permanent shoring
- Falsework 3 / 4
hardens?
- Scaffolding
- Cantilever formwork
Rationale: Falsework is temporary support for concrete structures
until self-supporting.
- In formwork design, the lateral pressure of fresh concrete is
influenced most by:
- Temperature
- Rate of concrete placement
- Color of concrete
- Type of curing
Rationale: Faster placement increases lateral pressure on formwork
and may cause failure.
- Which formwork component transmits the load from slabs to
- Tie rods
- Beams and joists
- Ply sheets
- Nails
supports?
Rationale: Beams and joists carry loads from the slab to the shoring
posts.
- What is the purpose of form ties?
- Reduce curing time
- Support scaffolding