California General Engineering Contractor (Class A) Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which type of bond guarantees that a contractor will perform the
- Bid bond
- Payment bond
- Performance bond
- License bond
contract according to its terms?
Rationale: Performance bonds guarantee that the contractor will fulfill all
contractual obligations, protecting the project owner.
- Under California law, what is the maximum time an employer has to
- 24 hours 1 / 4
report a work-related injury to the Division of Workers’ Compensation?
- 5 days
- 10 days
- 30 days
Rationale: California law requires employers to report work-related
injuries within 5 days to ensure timely medical and legal processing.
- Which document legally binds the contractor and owner to the project
- Change order
- Construction contract
- Bid proposal
- Purchase order
scope, schedule, and price?
Rationale: The construction contract outlines the legal obligations, scope
of work, schedule, and compensation for the project.
- What is the primary purpose of OSHA regulations in construction?
- Improve project efficiency
- Reduce costs
- Protect worker safety
- Ensure quality control
Rationale: OSHA regulations exist to protect workers from job-related
hazards and ensure a safe working environment.
- When is a contractor required to carry a Payment Bond?
- On any residential project
- On public works projects over $25,000 2 / 4
- On private projects
- Only for projects over $1,000,000
Rationale: California law requires payment bonds on public works projects
exceeding $25,000 to protect subcontractors and suppliers.
- Which of the following is a common method of construction project
- Float method
- Linear method
- Critical Path Method (CPM)
- Step method
scheduling?
Rationale: CPM identifies the longest sequence of dependent tasks and is
widely used for efficient project scheduling and resource allocation.
- What type of insurance protects a contractor against claims from
- Workers’ compensation
- Professional liability
- General liability insurance
- Builder’s risk insurance
property damage or bodily injury?
Rationale: General liability insurance covers third-party bodily injury and
property damage claims.
- Which contract type places the most risk on the contractor?
- Time and materials
- Cost-plus 3 / 4
- Lump sum (fixed-price)
- Unit price
Rationale: In lump sum contracts, the contractor assumes risk for cost
overruns and must deliver the agreed scope for the fixed price.
- What is the allowable tolerance for a finished concrete slab thickness on
- ±1 inch
- ±1/4 inch
- ±1/2 inch
- ±3/4 inch
a California public works project?
Rationale: Industry standards and Caltrans specifications typically allow a
±1/4 inch tolerance for slab thickness to maintain quality and safety.
- Which of the following best defines “change order”?
- A request for extra payment
- A work delay notice
- A written modification to the contract
- A purchase order for materials
Rationale: A change order is a formal document amending the original
contract terms, including scope, cost, or schedule.
- Under California contractor law, which action may result in license
- Delayed project completion
- Uninsured vehicle use
- / 4
suspension?