• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Class A Practice Exam Questions And

Class notes Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Hawaii General Engineering Contractor (Class A) Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • What is the primary purpose of a project schedule in construction
  • management?

  • To provide a marketing tool
  • To track project expenses
  • To coordinate resources and timelines
  • To train new employees

Rationale: A project schedule ensures that resources, tasks, and

timelines are properly coordinated to complete the project efficiently. 1 / 4

  • According to OSHA, which of the following is required for trenching
  • deeper than 5 feet?

  • Use of temporary ramps
  • Protective systems such as sloping or shoring
  • Use of ladders every 50 feet
  • No additional protection is needed

Rationale: OSHA mandates protective systems for trenches over 5

feet to prevent cave-ins.

  • Which soil type has the highest load-bearing capacity?
  • Sandy soil
  • Clay soil
  • Rock
  • Silt

Rationale: Rock provides the highest load-bearing capacity, followed

by dense sand and gravel.

  • What is the primary role of a general engineering contractor?
  • Designing buildings
  • Performing heavy construction and civil engineering projects
  • Selling construction materials
  • Performing interior design

Rationale: Class A general engineering contractors focus on heavy

civil works, such as roads, bridges, and infrastructure. 2 / 4

5. In construction contracts, “liquidated damages” refer to:

  • Penalties for late payments
  • Pre-determined compensation for project delays
  • Refunds for defective materials
  • Insurance claims

Rationale: Liquidated damages are agreed-upon amounts paid if a

contractor fails to meet the project schedule.

  • Which type of concrete is best for high-strength structural
  • applications?

  • Type I
  • Type II
  • Type III
  • High-performance concrete (HPC)

Rationale: HPC is engineered for high strength, durability, and

workability in structural applications.

  • In Hawaii, which agency regulates stormwater discharges for
  • construction sites?

  • EPA only
  • DOT only
  • Hawaii Department of Health (DOH)

D. OSHA

Rationale: The Hawaii DOH administers the NPDES stormwater

program for construction activities. 3 / 4

8. The critical path in a CPM schedule refers to:

  • The shortest path to completion
  • The sequence of activities that determines the project duration
  • Optional project tasks
  • Activities with the lowest cost

Rationale: The critical path is the longest sequence of dependent

activities that determines the shortest project duration.

  • What is the primary purpose of a change order?
  • To fire subcontractors
  • To submit a new bid
  • To modify the contract scope, cost, or schedule
  • To approve invoices

Rationale: Change orders formally adjust contract terms when

project conditions or requirements change.

  • What is the most common method for compacting granular
  • soils?

  • Rolling
  • Vibratory piling
  • Mechanical vibration
  • Water saturation

Rationale: Mechanical vibration is effective for densifying granular

soils like sand and gravel.

  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document provided step-by-step guides, which was incredibly useful for my research. Absolutely superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration