Hawaii General Building Contractor (Class B) Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which of the following is the primary purpose of a building permit?
- To increase property value
- To ensure compliance with building codes
- To verify contractor qualifications
- To speed up construction
Answer: B. To ensure compliance with building codes
Rationale: A building permit ensures that construction meets safety,
zoning, and code requirements, protecting both occupants and the public.
- What is the minimum slope required for a residential roof to ensure
proper drainage? 1 / 4
- 1/4 inch per foot
- 1/2 inch per foot
- 1 inch per foot
- 2 inches per foot
Answer: A. 1/4 inch per foot
Rationale: Residential roofs typically require at least a 1/4 inch per foot
slope to allow water to drain properly and prevent pooling or leakage.
- Which type of soil is most prone to expansive movement that can
- Sandy soil
- Clay soil
- Gravel
- Silt
damage foundations?
Answer: B. Clay soil
Rationale: Clay soil absorbs water and expands, then contracts when dry,
which can cause foundation movement and cracking.
- When installing a concrete slab, what is the primary reason for
- To prevent cracking due to shrinkage and load
- To improve appearance
- To reduce weight
- To speed curing time 2 / 4
reinforcing with steel?
Answer: A. To prevent cracking due to shrinkage and load
Rationale: Steel reinforcement (rebar or mesh) strengthens concrete,
helping it resist tension, shrinkage, and structural loads.
- Which type of fire-resistant rating is required for a two-hour-rated wall?
- 30 minutes
- 1 hour
- 2 hours
- 4 hours
Answer: C. 2 hours
Rationale: A two-hour fire-rated wall must resist fire exposure for two
hours to help contain fire and protect occupants.
- What is the standard thickness for interior gypsum wallboard in
- 1/4 inch
- 3/8 inch
- 1/2 inch
- 5/8 inch
residential construction?
Answer: C. 1/2 inch
Rationale: Standard residential interior walls typically use 1/2 inch
drywall, which balances strength and ease of installation.
- Which of the following best describes the function of a vapor barrier in a
wall assembly? 3 / 4
- To provide structural support
- To prevent moisture from entering wall cavities
- To act as insulation
- To enhance paint adhesion
Answer: B. To prevent moisture from entering wall cavities
Rationale: A vapor barrier reduces moisture infiltration, preventing mold,
rot, and structural damage.
- How often should scaffolding be inspected by a competent person?
- Weekly
- Daily
- Monthly
- Before each shift
Answer: D. Before each shift
Rationale: OSHA requires scaffolds to be inspected for safety hazards
before each work shift and after any incident that could affect integrity.
- What is the primary purpose of a footing in foundation construction?
- To anchor the building to the ground
- To distribute the load over a larger soil area
- To prevent water infiltration
- To support plumbing systems
- / 4