• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Class B Practice Exam Questions And

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Nevada General Building Contractor (Class B) Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • A Class B General Building Contractor in Nevada is primarily permitted

to construct:

  • Highways and bridges
  • Fire protection systems
  • Plumbing-only installations
  • Structures requiring two or more unrelated building trades

Rationale: Class B covers buildings requiring multiple trades.

  • Which document establishes the legal relationship between owner
  • and contractor?

  • Punch list
  • Contract 1 / 3
  • Change order
  • Bid bond

Rationale: Contract defines rights, responsibilities, and work scope.

  • Who enforces Nevada contractor licensing laws?

A. OSHA

  • Nevada State Contractors Board (NSCB)

C. ICC

D. UBC

Rationale: NSCB regulates contractor licensing.

  • Before starting work, a contractor must provide a residential

homeowner with:

  • Sworn statement of wages
  • Daily work logs
  • Residential disclosure statement
  • Blueprint ownership agreement

Rationale: Nevada requires disclosures to protect homeowners.

5. A bid bond guarantees:

  • Labor wages
  • The bidder will enter a contract if awarded
  • Materials are installed per code
  • Final inspection approval
  • Rationale: Bid bonds prevent bidders from backing out. 2 / 3

6. The most accurate type of estimate is:

  • Square-foot estimate
  • Rule of thumb estimate
  • Detailed quantity takeoff
  • Budgetary estimate

Rationale: Detailed takeoffs use actual measured quantities.

7. Retainage is withheld to:

  • Reduce progress payments
  • Pay suppliers directly
  • Ensure proper completion of work
  • Fund insurance requirements

Rationale: Retainage protects against incomplete/defective work.

8. A critical path schedule shows the:

  • Longest float
  • Shortest trade duration
  • Longest duration of dependent tasks
  • Labor crew skills

Rationale: Critical path defines the project minimum duration.

9. A lump-sum contract means:

  • Cost shared between owner & contractor
  • One fixed total price
  • Price varies with material changes
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

I was amazed by the in-depth analysis in this document. It enhanced my understanding. Truly remarkable!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

Nevada General Building Contractor (Class B) Practice Exam Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. A Class B General Building Contractor ...

Unlock Now
$ 1.00