• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Contractor Exam Questions And

Class notes Jan 3, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

CA Class A General Engineering Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf

  • What is the primary responsibility of a Class A General Engineering
  • Contractor in California?

  • Residential home construction
  • Construction of public works and heavy engineering projects
  • Interior design
  • Landscaping

Rationale: Class A contractors are licensed to handle major

engineering projects such as highways, bridges, and public utilities.

  • Before starting a project, what is required to legally perform
  • contracting work in California?

  • Insurance only
  • Bond only
  • A valid contractor’s license
  • A business permit

Rationale: Contractors must hold a valid California contractor

license appropriate to the work they perform.

  • Which type of insurance is legally required for California contractors
  • with employees?

  • Life insurance
  • Vehicle insurance
  • Workers’ compensation insurance
  • Health insurance 1 / 3

Rationale: Workers’ compensation insurance protects employees

from job-related injuries.

  • Which agency regulates contractor licensing in California?
  • Department of Labor

B. OSHA

  • California Contractors State License Board (CSLB)
  • Department of Transportation

Rationale: The CSLB issues licenses, enforces regulations, and

protects consumers.

  • What is the maximum amount a contractor can collect in advance for
  • home improvement work?

  • 25% of the contract price
  • 50% of the contract price
  • 10% of the contract price or $1,000, whichever is less
  • Full contract price

Rationale: California law limits down payments to protect

homeowners.

  • Which document defines the scope, cost, and timeline of a construction
  • project?

  • Blueprint
  • Change order
  • Contract agreement
  • Invoice

Rationale: The contract agreement legally binds the terms of the

project.

  • What is a bid bond used for in public works projects?
  • To pay workers
  • To purchase materials
  • To guarantee the bidder will enter into a contract if awarded
  • To insure the project

Rationale: A bid bond assures the owner that the winning bidder will

honor the bid.

  • Which type of bond protects project owners against contractor default?
  • Performance bond
  • Payment bond
  • Both A and B
  • License bond 2 / 3

Rationale: Performance bonds guarantee project completion;

payment bonds guarantee suppliers and subcontractors are paid.

  • When must a contractor provide a written change order?
  • Only at project start
  • Only at project end
  • Before work on the change begins
  • After billing

Rationale: Written change orders formalize scope changes and

protect both parties legally.

  • What is the primary purpose of OSHA regulations on
  • construction sites?

  • Reduce costs
  • Improve productivity
  • Ensure worker safety
  • Reduce material waste

Rationale: OSHA standards aim to prevent workplace injuries and

fatalities.

  • A contractor discovers a subsurface condition not indicated in the
  • plans. What is the first step?

  • Ignore it
  • Continue work
  • Notify the project owner or engineer immediately
  • Fix it privately

Rationale: Unexpected conditions must be reported to prevent liability

and contract disputes.

  • Which of the following is an example of heavy engineering
  • work?

  • Building a house
  • Landscaping
  • Highway construction
  • Installing cabinets

Rationale: Heavy engineering involves large-scale infrastructure

projects.

  • What type of contract is most commonly used for public works
  • projects?

  • Lump-sum contract
  • Unit-price contract
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

I was amazed by the practical examples in this document. It made learning easy. Truly impressive!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 3, 2026
Description:

CA Class A General Engineering Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf 1. What is the primary responsibility of a Class A Gener...

Unlock Now
$ 1.00