CA Class A General Engineering Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf
- What is the primary responsibility of a Class A General Engineering
- Residential home construction
- Construction of public works and heavy engineering projects
- Interior design
- Landscaping
Contractor in California?
Rationale: Class A contractors are licensed to handle major
engineering projects such as highways, bridges, and public utilities.
- Before starting a project, what is required to legally perform
- Insurance only
- Bond only
- A valid contractor’s license
- A business permit
contracting work in California?
Rationale: Contractors must hold a valid California contractor
license appropriate to the work they perform.
- Which type of insurance is legally required for California contractors
- Life insurance
- Vehicle insurance
- Workers’ compensation insurance
- Health insurance 1 / 3
with employees?
Rationale: Workers’ compensation insurance protects employees
from job-related injuries.
- Which agency regulates contractor licensing in California?
- Department of Labor
B. OSHA
- California Contractors State License Board (CSLB)
- Department of Transportation
Rationale: The CSLB issues licenses, enforces regulations, and
protects consumers.
- What is the maximum amount a contractor can collect in advance for
- 25% of the contract price
- 50% of the contract price
- 10% of the contract price or $1,000, whichever is less
- Full contract price
home improvement work?
Rationale: California law limits down payments to protect
homeowners.
- Which document defines the scope, cost, and timeline of a construction
- Blueprint
- Change order
- Contract agreement
- Invoice
project?
Rationale: The contract agreement legally binds the terms of the
project.
- What is a bid bond used for in public works projects?
- To pay workers
- To purchase materials
- To guarantee the bidder will enter into a contract if awarded
- To insure the project
Rationale: A bid bond assures the owner that the winning bidder will
honor the bid.
- Which type of bond protects project owners against contractor default?
- Performance bond
- Payment bond
- Both A and B
- License bond 2 / 3
Rationale: Performance bonds guarantee project completion;
payment bonds guarantee suppliers and subcontractors are paid.
- When must a contractor provide a written change order?
- Only at project start
- Only at project end
- Before work on the change begins
- After billing
Rationale: Written change orders formalize scope changes and
protect both parties legally.
- What is the primary purpose of OSHA regulations on
- Reduce costs
- Improve productivity
- Ensure worker safety
- Reduce material waste
construction sites?
Rationale: OSHA standards aim to prevent workplace injuries and
fatalities.
- A contractor discovers a subsurface condition not indicated in the
- Ignore it
- Continue work
- Notify the project owner or engineer immediately
- Fix it privately
plans. What is the first step?
Rationale: Unexpected conditions must be reported to prevent liability
and contract disputes.
- Which of the following is an example of heavy engineering
- Building a house
- Landscaping
- Highway construction
- Installing cabinets
work?
Rationale: Heavy engineering involves large-scale infrastructure
projects.
- What type of contract is most commonly used for public works
- Lump-sum contract
- Unit-price contract
- / 3
projects?