New Mexico Residential Building Contractor (GB-2) Practice Exam 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which entity licenses GB-2 Residential Building Contractors in New
- Department of Labor
- Construction Industries Division (CID)
- Environmental Protection Agency
- State Licensing Board
Mexico?
Rationale: CID regulates and licenses contractors in New Mexico.
- A GB-2 license allows construction on residential buildings of what
- One story
- Seven stories 1 / 3
maximum number of stories?
- Three stories
- Unlimited
Rationale: GB-2 covers residential buildings up to 3 stories.
- What code is primarily used for residential construction in NM?
A. UBC
- International Residential Code (IRC)
- NEC only
- BOCA Code
Rationale: New Mexico has adopted the IRC for residential
structures.
4. A contractor must notify CID of changes to business address within:
- 90 days
- 60 days
- 30 days
- 10 days
Rationale: State rules require reporting changes within 30 days.
- Who is responsible for obtaining building permits?
- Owner only
- Contractor
- Real estate agent
- Architect only
Rationale: Contractor typically pulls permits for work they perform. 2 / 3
6. Minimum headroom in stairways:
- 5'10"
- 6'2"
- 6'8"
- 7'6"
Rationale: IRC requires 6 ft 8 in minimum headroom.
7. Standard live load for sleeping rooms:
- 20 psf
- 30 psf
- 40 psf
- 50 psf
Rationale: Residential bedroom live load is 30 psf.
8. Minimum width of a residential hallway:
- 32"
- 30"
- 36"
- 40"
Rationale: IRC requires hallways to be at least 36" wide.
9. Guardrails are required for decks more than:
- 12" above grade
- 24"
- 30"