• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Contractor Licensing Exam Practice

Class notes Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Tennessee BC-B (Small Commercial Contractor) Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which of the following best describes the primary role of a BC-B
  • contractor?

  • Residential remodeling only
  • Large-scale commercial construction
  • Small commercial construction projects
  • Electrical and plumbing subcontracting

Rationale: BC-B contractors are licensed to perform small commercial

construction projects, typically under $5 million in value.

2. Before starting a construction project, a contractor must obtain:

  • A verbal agreement with the client 1 / 4
  • All required permits from local authorities
  • Only insurance certificates
  • A subcontractor agreement

Rationale: Permits ensure that construction complies with building codes

and legal requirements.

  • What is the maximum bonding requirement for a BC-B contractor in
  • Tennessee?

A. $50,000

B. $100,000

C. $500,000

D. $1,000,000

Rationale: Tennessee law requires BC-B contractors to maintain a surety

bond of at least $100,000 to protect clients against incomplete or defective work.

  • Which document legally defines the scope of work for a construction
  • project?

  • Invoice
  • Contract
  • Permit
  • Proposal

Rationale: A contract clearly defines project scope, responsibilities,

payment terms, and legal obligations. 2 / 4

5. The term “change order” refers to:

  • Terminating a contract
  • Modifying the original scope, cost, or schedule of work
  • A request for payment
  • Issuing a permit

Rationale: Change orders formalize any changes to the initial project

agreement to avoid disputes.

  • In Tennessee, how long must contractor records be retained?
  • 1 year
  • 2 years
  • 5 years
  • 10 years

Rationale: Contractors must keep project records, contracts, and financial

documents for five years for compliance and auditing purposes.

  • Which of the following is required for all BC-B contractors in
  • Tennessee?

  • OSHA 500 certification
  • Workers’ compensation insurance
  • LEED accreditation
  • EPA licensing

Rationale: Workers’ compensation coverage protects employees in case of

workplace injuries and is legally required. 3 / 4

  • What is the primary purpose of a construction lien?
  • To report accidents
  • To secure payment for labor or materials supplied
  • To obtain building permits
  • To hire subcontractors

Rationale: A lien ensures that contractors, subcontractors, and suppliers

can legally claim payment if unpaid.

  • Which of the following materials requires special handling due to
  • health risks?

  • Concrete
  • Wood
  • Asbestos
  • Glass

Rationale: Asbestos is a hazardous material and must be handled

according to safety regulations to prevent health risks.

  • What is the primary purpose of OSHA regulations on
  • construction sites?

  • Reduce project costs
  • Ensure worker safety and prevent accidents
  • Improve design quality
  • Expedite permit approval
  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

The detailed explanations offered by this document was incredibly useful for my research. A excellent purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 2, 2026
Description:

Tennessee BC-B (Small Commercial Contractor) Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. Which of the following best ...

Unlock Now
$ 1.00