• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Contractor Licensing Exam Practice Test

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

North Dakota Class B General Contractor Licensing Exam Practice Test 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • A primary requirement for obtaining a Class B contractor license in

North Dakota is:

  • Passing the master electrician exam
  • Maintaining worker’s compensation insurance
  • Hiring a full-time architect
  • Completing OSHA 40 certification

Rationale: Insurance coverage is a legal requirement for contractor

licensing in North Dakota.

  • Which building code is primarily adopted in North Dakota for
  • commercial construction?

  • National Building Code 1 / 3
  • International Building Code (IBC)
  • Uniform Building Code (UBC)
  • State-only proprietary code

Rationale: ND adopts the IBC as the basis for commercial building

standards.

3. Class B license holders in North Dakota may construct:

  • Unlimited-size commercial structures
  • Non-residential structures up to three stories
  • Only single-family homes
  • Bridges and heavy engineering projects

Rationale: Class B limits contractors to smaller commercial

structures.

4. A legal document that verifies ownership of land is the:

  • Building permit
  • Easement
  • Title
  • Covenant

Rationale: A title establishes ownership rights of property.

  • The primary document specifying the contractor-owner agreement is

the:

  • Bid schedule
  • Construction contract
  • Punch list 2 / 3
  • Safety plan

Rationale: The contract legally binds scope, cost, and terms.

6. The process of evaluating subcontractor proposals is known as:

  • Cost engineering
  • Bid review
  • Site mobilization
  • Procurement

Rationale: Bid review ensures fair pricing and contractor

qualification.

7. Retainage is typically withheld to:

  • Cover subcontractor lunch expenses
  • Increase contractor profits
  • Ensure project completion and corrections
  • Avoid insurance claims

Rationale: Retainage protects the owner until final completion.

8. If a worker falls on site, OSHA requires reporting within:

  • 48 hours
  • 7 days
  • 8 hours if fatal
  • 60 minutes always

Rationale: OSHA mandates rapid reporting for severe incidents.

9. The NFPA code primarily focuses on:

  • Accessibility requirements
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

With its practical examples, this document made learning easy. Definitely a impressive choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

North Dakota Class B General Contractor Licensing Exam Practice Test 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. A primary requirement fo...

Unlock Now
$ 1.00