Before leveling a mobile crane on outriggers, an operator should ensure: - ANS there is no weight of the crane bearing on any tires
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANS Keeping 90 degree angle between cylinder rod and pad
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANS Separate the boom hoist lines
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service? - ANS 6
On a mobile crane, how many broken wires are permitted at the end connection of a pendent before it must be taken out of service? - ANS 1
Type 1 rotation resistant hoist wire rope has a design factor of: - ANS 5 to 1
How many randomly distributed broken wires in rotation- resistant hoist wire rope are considered for replacement? - ANS 2 broken wires in 6 rope diameters
NCCCO CORE EXAM QUESTIONS
AND ANSWERS 1 / 2
@COPYRIGHT SIRJOEL
Page 2
The term net capacity is best defined by which of the terms listed below? - ANS Gross capacity minus capacity deductions
Mobile cranes that are set up on barges, shall have a list chart provided by which of the entities listed below? - ANS Manufacturer
When lifting loads on tires, mobile cranes are rated at what percentage of tipping? -
ANS 75%
How does the effective weight of a slowed extension relate to the actual weight of the extension? - ANS Higher than the actual weight.
When load radius is between radii values, the operator must use the: - ANS longer radius
Why should only approved attachments or extra counterweights provided by the manufacturer be placed on the rear of the crane? - ANS They could cause a backward stability problem.
A mobile crane's jib is offset 15º versus its original 0º offset, but the boom angle remains
unchanged. In this situation, the load radius: - ANS increases
Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect? - ANS Collapsing the boom.
When determining the position to a mobile crane should be left in over night, when high winds in the forecast the operator should: - ANS Follow the manufacturers recommendations.