• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

D 469 D469 Final Exam Latest

QUESTIONS & ANSWERS Dec 16, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

D 469 / D469 Final Exam (Latest Update 2025 / 2026) Quality, Continuous Improvement and Lean Six Sigma | Study Set Questions and Answers | Grade A | 100% Correct - WGU

Question:

Which Six Sigma certification is responsible for monitoring continuous improvement across all projects within a firm?

Answer:

Master Black Belt

Question:

Which Lean Six Sigma certification describes an upper management role responsible for providing resources and overcoming organizational barriers?

Answer:

Champion

  • / 4

Question:

What is a methodology that develops ideas and strategies to address specific problems for immediate improvement?

Answer:

Kaizen Blitz

Question:

What is an example of a poka-yoke in a production system?

Answer:

A dial that shuts off a production machine whenever the instrument needle falls below the desired range

Question:

Which quality method aims to develop perfect products or services with a statistical base goal of 3.4 defects per one million opportunities?

Answer:

Six Sigma

  • / 4

Question:

An industrial engineer reduced employee downtime by thirty percent by focusing on quality attributes of service.Which methodology did the industrial engineer use?

Answer:

Benchmarking

Question:

The production supervisor reduced product defects by fifty percent by implementing a specific technique in the production process.Which methodology did the supervisor use?

Answer:

Six Sigma

Question:

The four quality cost categories

Answer:

Internal failures External failures Appraisal Prevention.

  • / 4

Question:

A company employs a continuous improvement model within all stages of production, and all employees commit to manufacturing the best possible products.What is the applied process?

Answer:

Total quality management

Question:

Which tool should a quality manager use to brainstorm the possible causes of a quality issue?

Answer:

Fishbone diagram

Question:

Management discovered multiple problems within the production line and then developed processes to eliminate waste and reduce errors.Which method did the company implement?

Answer:

Lean Six Sigma

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the practical examples in this document. It enhanced my understanding. Truly excellent!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: QUESTIONS & ANSWERS
Added: Dec 16, 2025
Description:

D 469 / D469 Final Exam (Latest Update) Quality, Continuous Improvement and Lean Six Sigma | Study Set Questions and Answers | Grade A | 100% Correct - WGU Question: Which Six Sigma certification i...

Unlock Now
$ 1.00