• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

DBIA Exam 2 Latest - Answers | 100% Correct | Grade A Question: who ...

QUESTIONS & ANSWERS Dec 16, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

DBIA Exam 2 (Latest 2025 / 2026 Update) Questions & Verified Answers | 100% Correct | Grade A

Question:

who leads most design build projects?

Answer:

contractors

Question:

is design value a subjective deliverable?

Answer:

yes

Question:

how do you measure value?

Answer:

value = what you get for (or divided by) what you give design build principle is best value = performance + quality / cost 1 / 4

Question:

what is the difference between value and quality?

Answer:

design quality is easy to measure

quality is objective

value is subjective

value is hard to measure

Question:

why is value so hard to measure?

Answer:

value is in the eye of the beholder

owner defines value in the RFP so the DB team can deliver what the Owner wants

  • / 4

Question:

how is value engineering (VE) different between DBB and DB?

Answer:

DBB:

VE is performed without builder input VE is done after award, the owner receives some benefits

DB:

VE is inherent to design development process

DBer involved in VE of conceptual design owner receives no financial benefit, but received best value proposal price and faster schedule implicit in post award design management

Question:

what is costs management for DB delivery?

Answer:

design and cost integration designer estimator relationship conceptual vs. detailed estimating contingency design evolution (trend management) change management 3 / 4

Question:

what is the difference between DBB and DB in terms of cost and design?

Answer:

design is established first in DBB, whereas in DB cost is established first

Question:

what is the designer estimator relationship?

Answer:

the designer and design builder must work together with the estimator, requires true team work

Question:

what is detailed estimating?

Answer:

100% design complete

prescriptive specs

no flexibility

count parts and pieces and multiply by unit pricing for labor and material

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the detailed explanations in this document. It made learning easy. Truly superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: QUESTIONS & ANSWERS
Added: Dec 16, 2025
Description:

DBIA Exam 2 (Latest Update) Questions & Verified Answers | 100% Correct | Grade A Question: who leads most design build projects? Answer: contractors Question: is design value a subjective delivera...

Unlock Now
$ 1.00