DBIA Exam (Latest Update 2025 / 2026) Prep Questions with Answers | 100% Correct | Grade A
Question:
Performance Requirements
Answer:
____ ____ should identify end results.
Question:
Design Build
Answer:
Single point of responsibility for both design & construction is an attribute of what delivery method?
Question:
Substantiation
Answer:
The process of checking milestones along the way for completeness.
- / 2
Question:
Prescriptive
Answer:
Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance.
Question:
Miller Act 1935
Answer:
Federal Government passed bond adopting a Miller right requiring payment and performance bonds on all public works.
Question:
Qualifications Based Brooks Act 1972
Answer:
A/E's selected on qualifications
Question:
Clinger Cohen Act 1996 Defense Procurement Reform Act
Answer:
Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build.