• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Demolition Contractor Exam

Class notes Jan 3, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Ca C21 Building Moving And Demolition Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf

  • What is the primary safety concern when beginning demolition on an
  • older structure?

  • Weather conditions
  • Availability of workers
  • Presence of hazardous materials
  • Utility trenching

Rationale: Old structures often contain asbestos, lead, or other hazardous

materials requiring mitigation before any demolition begins.

  • Before moving a building, what must be verified first?
  • Number of occupants
  • Structural integrity
  • Wall color
  • Insurance cost

Rationale: The building must be structurally sound enough to withstand

lifting and transport.

  • Which equipment is most commonly used for selective interior
  • demolition? 1 / 3

  • Tower crane
  • Skid-steer with demolition attachments
  • Asphalt paver
  • Boom lift

Rationale: Skid-steers with breakers or grapples are ideal for interior

teardown in confined spaces.

  • What is the primary purpose of shoring during building movement?
  • Reduce noise
  • Increase ventilation
  • Support loads to prevent collapse
  • Provide anchoring points

Rationale: Shoring ensures the structure remains stable during lifting and

transport.

  • Who is responsible for locating underground utilities before
  • excavation or demolition?

  • The city inspector
  • The contractor
  • The architect
  • The homeowner

Rationale: Contractors must request utility marking before disturbing soil

to avoid hazards.

  • Which type of foundation typically requires cutting before lifting a
  • building?

  • Pier
  • Slab-on-grade
  • Crawlspace
  • Post-tension

Rationale: Slab-on-grade foundations must be separated from the structure

prior to lifting.

  • What is the safest method to control dust in mechanical demolition? 2 / 3
  • Using leaf blowers
  • Applying water spray
  • Increasing machine power
  • Demolishing faster

Rationale: Water spray suppresses airborne dust and meets regulatory

requirements.

  • Which document verifies legal authority to move a structure on public
  • roads?

  • Jobsite safety plan
  • Oversize load permit
  • Insurance binder
  • Demolition plan

Rationale: Moving large structures requires oversize load permits for street

use.

  • What is the typical first step in a complete building demolition
  • sequence?

  • Removing the roof
  • Disconnecting utilities
  • Loading debris
  • Breaking the foundation

Rationale: Utilities must be shut off and capped before any demolition

begins to prevent hazards.

  • When cutting steel beams during demolition, what hazard must be
  • monitored?

  • Moisture levels
  • Falling materials
  • Color change
  • Noise level

Rationale: Cut steel can shift or fall suddenly as structural connections

release.

  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document featured in-depth analysis that enhanced my understanding. Such an excellent resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 3, 2026
Description:

Ca C21 Building Moving And Demolition Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf 1. What is the primary safety concern when beginn...

Unlock Now
$ 1.00