- What is the primary safety concern when beginning demolition on an
- Weather conditions
- Availability of workers
- Presence of hazardous materials
- Utility trenching
older structure?
Rationale: Old structures often contain asbestos, lead, or other hazardous
materials requiring mitigation before any demolition begins.
- Before moving a building, what must be verified first?
- Number of occupants
- Structural integrity
- Wall color
- Insurance cost
Rationale: The building must be structurally sound enough to withstand
lifting and transport.
- Which equipment is most commonly used for selective interior
demolition? 1 / 3
- Tower crane
- Skid-steer with demolition attachments
- Asphalt paver
- Boom lift
Rationale: Skid-steers with breakers or grapples are ideal for interior
teardown in confined spaces.
- What is the primary purpose of shoring during building movement?
- Reduce noise
- Increase ventilation
- Support loads to prevent collapse
- Provide anchoring points
Rationale: Shoring ensures the structure remains stable during lifting and
transport.
- Who is responsible for locating underground utilities before
- The city inspector
- The contractor
- The architect
- The homeowner
excavation or demolition?
Rationale: Contractors must request utility marking before disturbing soil
to avoid hazards.
- Which type of foundation typically requires cutting before lifting a
- Pier
- Slab-on-grade
- Crawlspace
- Post-tension
building?
Rationale: Slab-on-grade foundations must be separated from the structure
prior to lifting.
- What is the safest method to control dust in mechanical demolition? 2 / 3
- Using leaf blowers
- Applying water spray
- Increasing machine power
- Demolishing faster
Rationale: Water spray suppresses airborne dust and meets regulatory
requirements.
- Which document verifies legal authority to move a structure on public
- Jobsite safety plan
- Oversize load permit
- Insurance binder
- Demolition plan
roads?
Rationale: Moving large structures requires oversize load permits for street
use.
- What is the typical first step in a complete building demolition
- Removing the roof
- Disconnecting utilities
- Loading debris
- Breaking the foundation
sequence?
Rationale: Utilities must be shut off and capped before any demolition
begins to prevent hazards.
- When cutting steel beams during demolition, what hazard must be
- Moisture levels
- Falling materials
- Color change
- Noise level
monitored?
Rationale: Cut steel can shift or fall suddenly as structural connections
release.