Delaware General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the primary purpose of a building permit?
- To provide insurance for contractors
- To verify contractor licensure
- To ensure compliance with local building codes
- To secure financing for construction
Rationale: Building permits ensure construction projects comply with local
codes, zoning, and safety regulations.
- Which type of insurance is required for a contractor to protect against
- General liability insurance 1 / 4
on-site injuries to workers?
- Workers’ compensation insurance
- Professional liability insurance
- Property insurance
Rationale: Workers’ compensation insurance covers employees who are
injured on the job.
- What is the primary purpose of a lien on a property?
- To increase property value
- To insure the property
- To secure payment for labor or materials provided
- To reduce taxes
Rationale: A lien ensures contractors or suppliers can be paid for work or
materials provided.
- Which of the following is a common cause of construction project
- Using high-quality materials
- Proper scheduling
- Weather conditions
- Efficient labor management
delays?
Rationale: Weather conditions frequently cause delays in construction
projects.
- In Delaware, how often must a contractor renew their general
- Every year 2 / 4
contractor license?
- Every two years
- Every three years
- Every five years
Rationale: Delaware requires general contractor licenses to be renewed
biennially.
- What is the first step in the project planning process?
- Hiring subcontractors
- Defining project scope
- Ordering materials
- Inspecting the site
Rationale: Project scope defines objectives, deliverables, and boundaries.
- Which OSHA standard is critical for fall protection on construction sites?
A. OSHA 1910
B. OSHA 1926
C. OSHA 1801
D. OSHA 2000
Rationale: OSHA 1926 covers safety regulations specific to construction,
including fall protection.
- What type of contract guarantees a fixed price for the project regardless
- Time and materials contract
- Cost-plus contract
- Lump-sum contract 3 / 4
of actual costs?
- Unit-price contract
Rationale: Lump-sum contracts establish a fixed price for the project,
transferring risk to the contractor.
- Which soil type has the highest load-bearing capacity?
- Clay
- Silt
- Rock
- Sand
Rationale: Rock provides the most stable foundation due to its density and
strength.
- What is the primary purpose of a building foundation?
- To support aesthetic design
- To transfer structural loads to the soil
- To prevent theft of materials
- To reduce labor costs
Rationale: Foundations distribute the weight of the structure safely into
the ground.
- What is the minimum distance required for smoke detectors in
- 2 feet from walls
- 5 feet from windows
- In every bedroom and hallway
- Only in kitchens
- / 4
residential buildings according to Delaware code?