Florida Certified Building Contractor Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which document establishes the legal scope of work between a
- Building permit
- Work order
- Contract
- Certificate of occupancy
contractor and a client?
Rationale: A contract legally defines the scope, responsibilities, and
obligations of both the contractor and client, serving as the primary legal document in construction agreements. 1 / 4
- What is the minimum fire-resistance rating required for a bearing wall in
- 15 minutes
- 1 hour
- 2 hours
- 3 hours
a three-story residential building in Florida?
Rationale: Building codes require load-bearing walls to meet a minimum
fire-resistance rating to prevent collapse and allow safe evacuation.
- What is the primary purpose of a building permit?
- To schedule inspections
- To ensure compliance with building codes
- To guarantee project funding
- To provide insurance coverage
Rationale: Permits ensure construction work complies with local, state, and
national building codes and safety standards.
- In concrete construction, what is the ideal water-cement ratio for
structural strength?
A. 0.9–1.0
B. 0.4–0.6
C. 0.7–0.8
D. 0.2–0.3 2 / 4
Rationale: A water-cement ratio of 0.4–0.6 balances workability and
strength, ensuring proper curing and durability.
- Which type of insurance protects a contractor against claims of property
- Workers’ compensation
- Vehicle insurance
- General liability insurance
- Professional liability insurance
damage or injury caused by the contractor's operations?
Rationale: General liability insurance covers bodily injury or property
damage claims arising from contractor operations.
- In Florida, what is the statute of limitations for construction defect
- 2 years
- 4 years
- 6 years
- 10 years
claims on a residential structure?
Rationale: Florida law typically allows a 4-year period to file claims for
construction defects on residential properties.
- What is the recommended minimum slope for a residential roof to
- 1/4 inch per foot
- 1/2 inch per foot 3 / 4
ensure proper drainage?
- 1/2 inch to 1 inch per foot
- 2 inches per foot
Rationale: A slope of 1/2 to 1 inch per foot prevents water accumulation and
potential roof damage.
- Which soil test is commonly used to determine load-bearing capacity for
- pH test
- Percolation test
- Standard Penetration Test (SPT)
- Atterberg limits test
foundations?
Rationale: SPT measures soil resistance and is widely used to assess load-
bearing characteristics for structural foundations.
9. The most common method of termite prevention in Florida is:
- Chemical spray on the walls
- Soil treatment with termiticide
- Frequent inspections only
- Installing wooden barriers
Rationale: Soil treatment with termiticides creates a protective barrier
preventing subterranean termite infestations.
- What is the primary role of the Florida Building Code (FBC)?
- To standardize architectural designs
- To regulate contractor fees
- / 4