- What is the primary purpose of an erosion and sediment control plan?
- To reduce construction costs
- To prevent soil erosion and sediment pollution **
- To improve soil fertility
- To increase land value
Rationale: The main goal of an ESC plan is to prevent sediment from
leaving a construction site and entering waterways.
- Which Ohio agency is primarily responsible for enforcing erosion and
- Ohio EPA **
- Ohio DOT
- Ohio Department of Agriculture 1 / 4
sediment control regulations?
- Ohio DNR
Rationale: The Ohio Environmental Protection Agency oversees
erosion and sediment control compliance in the state.
- What is the allowable soil loss from a construction site under Ohio’s
- 5 tons/acre/year
- 10 tons/acre/year
- 1 ton/acre/year
- Varies based on site conditions **
sediment control standards?
Rationale: The allowable soil loss is site-specific, depending on slope,
soil type, and BMPs implemented.
4. Silt fences are primarily designed to:
- Stabilize steep slopes
- Trap sediment in runoff **
- Improve soil structure
- Control groundwater flow
Rationale: Silt fences slow runoff and capture sediment before it
leaves the construction site.
- When should temporary seeding be installed on disturbed areas?
- Immediately after construction begins
- Within 7 days of last disturbance **
- At the end of the project
- Only during spring 2 / 4
Rationale: Temporary seeding stabilizes soil quickly and minimizes
erosion after disturbance.
- What is the maximum height for a silt fence according to Ohio
- 12 inches
- 18 inches
- 30 inches **
- 48 inches
standards?
Rationale: Standard silt fence height is 30 inches to effectively trap
sediment without failing.
- Which soil property has the greatest influence on erosion potential?
- Color
- Texture **
- Temperature
- Depth
Rationale: Soil texture determines how easily soil particles detach
and move with water.
- What is the first step in designing an ESC plan?
- Installing BMPs
- Identifying potential pollutant sources **
- Scheduling inspections
- Seeding the site 3 / 4
Rationale: Identifying where erosion and sediment may occur is
essential before selecting control measures.
9. Construction entrance stabilization is used to:
- Prevent vehicles from leaving the site with sediment **
- Reduce noise pollution
- Improve traffic flow
- Stabilize soil in wet areas
Rationale: Stabilized entrances reduce sediment tracking onto public
roads.
10. Check dams are primarily used to:
- Reduce velocity in drainage channels **
- Filter pollutants from stormwater
- Prevent soil compaction
- Support slope vegetation
Rationale: Check dams slow water in channels, reducing erosion and
sediment transport.
- Which of the following is a structural BMP?
- Mulching
- Silt fence **
- Temporary seeding
- Conservation tillage
Rationale: Structural BMPs are physical installations that control
sediment and runoff.