Illinois General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which of the following is the primary purpose of the Illinois
- To regulate unions in construction
- To protect the public by ensuring contractors meet minimum
- To set construction material prices
- To enforce OSHA regulations
Contractors’ License Act?
standards
Rationale: The Illinois Contractors’ License Act is designed to ensure that
contractors meet minimum qualifications to protect the public. 1 / 4
- When a subcontractor fails to complete work on time, the general
contractor should first:
- Terminate the subcontract immediately
- Review the contract and communicate with the subcontractor
- Hire another subcontractor without notice
- File a lawsuit immediately
Rationale: Communication and contract review are the first steps in
resolving subcontractor performance issues.
- OSHA requires employers to provide which of the following to
- Free meals
- Safe working conditions
- Paid time off
- Job promotions
employees?
Rationale: OSHA regulations mandate that employers provide safe and
healthful working conditions.
- What is the primary purpose of a building code?
- To make construction more expensive
- To encourage architectural creativity
- To regulate zoning laws
- To ensure safety, health, and welfare of the public 2 / 4
Rationale: Building codes establish minimum standards for safety, health,
and public welfare in construction.
- A contract states that work must be completed in 90 days. If weather
delays 10 days, the contractor should:
- Finish late without notifying the owner
- Request a time extension based on contract provisions
- Abandon the project
- Charge the subcontractors for the delay
Rationale: Contracts often include provisions for excusable delays such as
weather, which must be formally addressed.
- What is the most common method for preventing back injuries on a
- Stretching daily
- Proper lifting techniques and mechanical aids
- Wearing steel-toed boots
- Drinking water frequently
construction site?
Rationale: Proper lifting methods and mechanical aids reduce the risk of
musculoskeletal injuries.
- A project schedule showing the sequence of construction activities is
called a:
- Budget
- Invoice 3 / 4
- Critical path method (CPM) schedule
- Punch list
Rationale: CPM schedules identify the sequence and duration of activities
for effective project management.
- What is the standard slope for a flat roof to allow drainage?
A. 1:1
B. 1:12
C. 12:12
- 1/4 inch per foot
Rationale: A slight slope of 1/4 inch per foot is typical to ensure water
drains off flat roofs.
9. When estimating concrete, the term “yield” refers to:
- The price per cubic yard
- The volume of concrete produced per batch
- Strength of the concrete
- Water-cement ratio
Rationale: Yield indicates the actual volume of concrete that a batch will
produce.
10. The difference between a bid and a proposal is:
- A bid is legally binding, a proposal is not
- A proposal may include technical solutions; a bid focuses on price
- / 4