• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Practice Questions And Correct

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Montana General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • What is the primary purpose of the Montana Contractor Registration
  • Act?

  • To enforce residential building design
  • To regulate construction material pricing
  • To ensure contractors are registered and accountable
  • To control labor unions

Rationale: Ensures contractors performing work are registered for

public protection.

  • Which building code is adopted statewide in Montana for most
  • construction?

  • International Existing Building Code only 1 / 3
  • International Building Code (IBC)
  • National Building Code
  • State-developed code

Rationale: Montana adopts the International Building Code as the

primary statewide standard.

  • OSHA requires a fall-protection plan at what height in construction?
  • 3 feet
  • 5 feet
  • 6 feet
  • 12 feet

Rationale: OSHA mandates fall protection for workers at or above 6

feet.

4. The main function of a performance bond is to:

  • Protect workers from injury
  • Ensure the contractor completes the project
  • Guarantee material prices
  • Provide design insurance

Rationale: Performance bonds ensure contractual completion.

  • What is retainage?
  • List of materials
  • Payment penalty
  • Portion of payment withheld to ensure completion
  • Insurance policy 2 / 3

Rationale: Owners withhold retainage as financial security for

project completion.

6. The ADA requires ramps to have a maximum running slope of:

A. 1:8

B. 1:10

C. 1:12

D. 1:20

Rationale: ADA standards require 1:12 slope for accessibility.

  • Which contract type places the greatest cost risk on the contractor?
  • Cost-plus fee
  • Lump-sum/fixed price
  • Time and materials
  • Guaranteed maximum price

Rationale: Lump-sum contracts place risk on contractor to stay within

bid price.

  • What document lists changes to contract requirements?
  • Bid form
  • Change order
  • Scope statement
  • Addendum

Rationale: Change orders modify contract scope after signing.

  • Which soil type has the lowest load-bearing strength?
  • Gravel
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

With its detailed explanations, this document was incredibly useful for my research. Definitely a excellent choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

Montana General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. What is the primary purpose of the Montana Con...

Unlock Now
$ 1.00