• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Practice Questions And Correct

Class notes Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Vermont General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • What is the primary purpose of a building permit?
  • To guarantee contractor payment
  • To ensure compliance with building codes and safety standards
  • To increase property value
  • To expedite construction

Rationale: Building permits are issued to ensure that construction meets

safety, zoning, and building code requirements.

  • Which type of insurance is required for all Vermont general
  • contractors?

  • Life insurance 1 / 4
  • Health insurance
  • Workers’ compensation insurance
  • Flood insurance

Rationale: Workers’ compensation insurance protects employees in case of

work-related injuries.

  • A Vermont contractor must provide a written contract for any project
  • exceeding what amount?

A. $1,000

B. $2,500

C. $3,000

D. $5,000

Rationale: Vermont law requires written contracts for home improvement

or construction projects exceeding $3,000.

  • What is the typical maximum penalty for working without a Vermont
  • contractor license?

  • $500 fine
  • $1,000 fine per violation
  • 10 days in jail
  • Revocation of business license only

Rationale: Operating without a license can result in civil fines and other

enforcement actions. 2 / 4

  • Which document specifies the materials, workmanship, and work
  • schedule for a construction project?

  • Invoice
  • Construction contract
  • Bid proposal
  • Warranty

Rationale: The construction contract defines project scope, materials, and

timeline.

  • In Vermont, how long is the typical statute of limitations for
  • construction defect claims?

  • 1 year
  • 3 years
  • 6 years
  • 10 years

Rationale: Vermont law generally allows six years for claims related to

construction defects.

  • A subcontractor’s lien in Vermont is valid for how long after the last
  • day of work?

  • 30 days
  • 60 days
  • 90 days
  • 120 days 3 / 4

Rationale: Mechanics’ liens must be filed within 90 days after the last day

of work according to Vermont law.

  • What is the main purpose of OSHA regulations on a job site?
  • To reduce project costs
  • To protect workers’ safety and health
  • To manage scheduling
  • To regulate building design

Rationale: OSHA sets workplace safety standards to prevent accidents and

injuries.

  • Which of the following is a common type of foundation for residential
  • buildings in Vermont?

  • Floating slab
  • Concrete slab-on-grade
  • Straw bale
  • Bamboo

Rationale: Slab-on-grade foundations are widely used in residential

construction in Vermont.

  • What is the minimum slope required for a residential roof to
  • ensure proper drainage?

A. 1/2:12

B. 2:12

  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

The in-depth analysis offered by this document enhanced my understanding. A outstanding purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 2, 2026
Description:

Vermont General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. What is the primary purpose of a building perm...

Unlock Now
$ 1.00