Ohio Stormwater Inspector Certification Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2025|2026 Q&A | Instant Download Pdf
- What is the primary purpose of a stormwater management program?
- To increase construction site efficiency
- To reduce pollutants in stormwater runoff
- To improve soil fertility
- To promote groundwater extraction
Rationale: The primary purpose of stormwater management programs is
to reduce pollutants in runoff, preventing water quality degradation and protecting aquatic ecosystems.
- Which federal law primarily governs stormwater discharges in the
United States? 1 / 4
- Clean Air Act
- Safe Drinking Water Act
- Clean Water Act
- Resource Conservation and Recovery Act
Rationale: The Clean Water Act regulates the discharge of pollutants into
U.S. waters, including stormwater from construction sites and municipal separate storm sewer systems (MS4s).
- What does NPDES stand for?
- National Pollution Disposal and Enforcement System
- National Pollutant Discharge Elimination System
- National Program for Drainage and Environmental Safety
- National Pollution Detection and Evaluation Standard
Rationale: NPDES permits control water pollution by regulating point
sources of pollutant discharge into waters of the U.S., including stormwater.
- Which of the following is a structural best management practice (BMP)
- Employee training programs
- Detention basins 2 / 4
for stormwater control?
- Street sweeping
- Erosion control education
Rationale: Structural BMPs physically manage stormwater flow and
quality, such as detention basins, retention ponds, and sediment traps.
- Sediment runoff from construction sites is primarily a problem because
it:
- Improves soil fertility downstream
- Reduces stormwater volume
- Clogs waterways and harms aquatic habitats
- Increases air pollution
Rationale: Sediment runoff can degrade water quality, fill streams,
smother aquatic habitats, and carry attached pollutants.
- During inspections, which of the following is the most important to
- Nearby traffic conditions
- BMP installation and maintenance status
- Employee work schedules
- Air quality readings
document?
Rationale: Inspectors must document the condition and effectiveness of
BMPs to ensure compliance with permits and regulations. 3 / 4
- What is the first step in an effective erosion and sediment control plan?
- Installing storm drains
- Site assessment and planning
- Planting vegetation immediately
- Paving access roads
Rationale: A thorough site assessment helps identify potential sources of
erosion and areas needing protection, guiding BMP placement.
- Which of the following pollutants is commonly associated with
- Ozone
- Sediment
- Carbon monoxide
- Chlorofluorocarbons
stormwater runoff from construction sites?
Rationale: Sediment is the most common pollutant from construction sites,
resulting from disturbed soils.
- What is the primary function of silt fences?
- Divert large floodwaters
- Increase soil compaction
- / 4