• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Practice Questions And Correct

Class notes Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Wyoming General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • Which of the following is the primary purpose of a performance bond
  • in construction?

  • To insure the contractor’s equipment
  • To guarantee timely completion of the project
  • To protect workers from injury
  • To provide liability coverage
  • To guarantee timely completion of the project

Rationale: A performance bond ensures that the contractor will complete

the project according to the contract terms. 1 / 4

  • What is the maximum allowable working load for a standard 3/8-inch
  • diameter steel wire rope used for hoisting?

  • 1,000 lbs
  • 3,150 lbs
  • 5,400 lbs
  • 7,500 lbs
  • 3,150 lbs

Rationale: Safety standards specify the working load limit to prevent

overloading and failure of lifting equipment.

  • Which type of insurance covers property damage or injury caused by
  • the contractor’s operations?

  • Workers’ Compensation
  • General Liability
  • Builder’s Risk
  • Professional Liability
  • General Liability

Rationale: General liability insurance protects the contractor against

claims of property damage or bodily injury caused during operations.

  • According to OSHA, which of the following is considered a “serious”
  • violation?

  • Minor paperwork omission
  • Workplace hazard with substantial probability of death or serious
  • physical harm 2 / 4

  • Violation of a non-safety regulation
  • Employee tardiness
  • Workplace hazard with substantial probability of death or serious
  • physical harm Rationale: A “serious” violation is defined by OSHA as one that could result in death or serious injury.

  • Which of the following is required before starting excavation near
  • underground utilities?

  • Written approval from the city council
  • Contacting the utility locator service
  • Installing temporary fencing
  • Ordering heavy equipment
  • Contacting the utility locator service

Rationale: Locating underground utilities prevents damage, injuries, and

service interruptions.

  • A contract that provides for payment upon completion of milestones is

known as a:

  • Lump sum contract
  • Unit price contract
  • Cost-plus contract
  • Progress payment contract 3 / 4
  • Progress payment contract

Rationale: Progress payment contracts allow the contractor to be paid as

work is completed according to agreed milestones.

  • Which of the following is considered the most effective method of
  • controlling soil erosion on a construction site?

  • Installing temporary fencing
  • Using silt fences and sediment basins
  • Compacting soil only
  • Spraying water daily
  • Using silt fences and sediment basins

Rationale: Silt fences and sediment basins trap sediment and reduce

runoff, effectively controlling soil erosion.

  • When a subcontractor fails to perform, who is typically responsible for
  • resolving the issue?

  • Project architect
  • Prime contractor
  • Owner
  • Local building department
  • Prime contractor

Rationale: The prime contractor manages subcontractors and is

responsible for project completion.

  • / 4

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

I was amazed by the comprehensive coverage in this document. It was a perfect resource for my project. Truly excellent!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration