Wyoming General Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which of the following is the primary purpose of a performance bond
- To insure the contractor’s equipment
- To guarantee timely completion of the project
- To protect workers from injury
- To provide liability coverage
- To guarantee timely completion of the project
in construction?
Rationale: A performance bond ensures that the contractor will complete
the project according to the contract terms. 1 / 4
- What is the maximum allowable working load for a standard 3/8-inch
- 1,000 lbs
- 3,150 lbs
- 5,400 lbs
- 7,500 lbs
- 3,150 lbs
diameter steel wire rope used for hoisting?
Rationale: Safety standards specify the working load limit to prevent
overloading and failure of lifting equipment.
- Which type of insurance covers property damage or injury caused by
- Workers’ Compensation
- General Liability
- Builder’s Risk
- Professional Liability
- General Liability
the contractor’s operations?
Rationale: General liability insurance protects the contractor against
claims of property damage or bodily injury caused during operations.
- According to OSHA, which of the following is considered a “serious”
- Minor paperwork omission
- Workplace hazard with substantial probability of death or serious
violation?
physical harm 2 / 4
- Violation of a non-safety regulation
- Employee tardiness
- Workplace hazard with substantial probability of death or serious
- Which of the following is required before starting excavation near
- Written approval from the city council
- Contacting the utility locator service
- Installing temporary fencing
- Ordering heavy equipment
- Contacting the utility locator service
physical harm Rationale: A “serious” violation is defined by OSHA as one that could result in death or serious injury.
underground utilities?
Rationale: Locating underground utilities prevents damage, injuries, and
service interruptions.
- A contract that provides for payment upon completion of milestones is
known as a:
- Lump sum contract
- Unit price contract
- Cost-plus contract
- Progress payment contract 3 / 4
- Progress payment contract
Rationale: Progress payment contracts allow the contractor to be paid as
work is completed according to agreed milestones.
- Which of the following is considered the most effective method of
- Installing temporary fencing
- Using silt fences and sediment basins
- Compacting soil only
- Spraying water daily
- Using silt fences and sediment basins
controlling soil erosion on a construction site?
Rationale: Silt fences and sediment basins trap sediment and reduce
runoff, effectively controlling soil erosion.
- When a subcontractor fails to perform, who is typically responsible for
- Project architect
- Prime contractor
- Owner
- Local building department
- Prime contractor
resolving the issue?
Rationale: The prime contractor manages subcontractors and is
responsible for project completion.