Maine General Contractor Licensing Exam Practice Test 100 Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which Maine agency oversees building code adoption and
- Department of Environmental Protection
- Office of Professional and Occupational Regulation
- Maine Uniform Building and Energy Code (MUBEC) Board
- Department of Transportation
enforcement statewide?
Rationale: MUBEC establishes and enforces statewide building and
energy codes in Maine.
2. The primary purpose of a building permit is to:
- Increase construction fees 1 / 3
- Ensure compliance with building codes
- Speed up construction schedules
- Protect contractors from liability
Rationale: Permits ensure work meets safety and code compliance
requirements.
- When must a contractor in Maine provide a written contract for
- For projects above $3,000
- For any roofing work only
- Only if requested by the homeowner
- For home construction or repair costing more than $3,000
residential construction?
Rationale: Maine law requires written home construction contracts
exceeding $3,000.
4. Workers’ Compensation in Maine is required when a contractor:
- Has only independent subcontractors
- Employs one or more employees
- Has more than 5 employees
- Pays over $50,000 in payroll
Rationale: Maine mandates coverage for contractors with at least
one employee.
5. Building code snow load requirements in Maine are generally:
- Optional unless homeowner requests
- Higher due to severe winter climate 2 / 3
- Lower than national standards
- Only required for commercial structures
Rationale: Maine’s climate requires increased structural snow load
design.
6. A “change order” must include:
- Verbal approval only
- Subcontractor signatures
- Written details of added scope and cost
- Architect approval only
Rationale: Change orders legally document scope, cost, and schedule
modifications.
7. The Maine lien law requires a Notice of Lien to be filed within:
- 120 days of the contract date
- 90 days after last labor or materials provided
- 30 days after start of work
- Before work begins
Rationale: Contractors must file within 90 days of last furnishing.
- OSHA requires fall protection at what height in construction?
- 3 feet
- 10 feet
- 6 feet
- 15 feet