• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Practice Test Questions And

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

North Carolina Residential Contractor Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • What is the minimum ceiling height required for habitable rooms in a
  • residential structure per NC Residential Code?

  • 6 ft 8 in
  • 7 ft 0 in
  • 7 ft 6 in
  • 6 ft 6 in

Rationale: Minimum ceiling height for habitable spaces is 7 feet by

code.

  • Which document establishes the legal owner and property lines
  • before construction?

a) Building permit 1 / 3

b) Property survey

c) OSHA site log

d) Special inspection report

Rationale: A survey confirms boundary limits necessary for

construction compliance.

3. The primary purpose of a footing is to:

a) Provide moisture protection

b) Level the floor

c) Distribute building loads to the soil

d) Anchor siding

Rationale: Footings spread structural loads safely to the supporting

soil.

  • When must a contractor obtain a North Carolina residential license?

a) All projects

b) Projects over $10,000

c) Projects costing $40,000 or more

d) Projects over 1,000 sq ft

Rationale: NC law requires licensing for residential projects ≥

$40,000.

5. GFCI protection is required for outlets located:

a) Living rooms

b) Bedrooms

c) Bathrooms 2 / 3

d) Hallways

Rationale: Bathrooms are wet locations requiring GFCIs for safety.

  • Which schedule lists project start/end dates and sequencing?

a) Estimate sheet

b) Critical path method schedule

c) Project manual

d) Soil compaction report

Rationale: CPM outlines activity duration and sequencing for time

management.

7. The top plate of a load-bearing wall must be lap-spliced a minimum of:

  • 12 inches
  • 24 inches
  • 8 inches
  • 48 inches

Rationale: Code requires 24" overlap or equivalent fastening on top

plates.

  • What is the minimum compressive strength for concrete footings
  • supporting a residence?

  • 2000 psi
  • 2500 psi
  • 1500 psi
  • 3000 psi
  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document featured in-depth analysis that made learning easy. Such an outstanding resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

North Carolina Residential Contractor Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. What is the minimum ceiling height requi...

Unlock Now
$ 1.00