• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Practice Test Questions And

Exam (elaborations) Jan 2, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Oklahoma Building Contractor Licensing Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf

  • The primary purpose of the Oklahoma Uniform Building Code

Commission is to:

  • Issue contractor licenses
  • Enforce federal OSHA rules
  • Adopt statewide building codes
  • Provide construction financing

Rationale: The OUBCC adopts and updates building codes statewide

but does not issue licenses.

2. A building contractor license in Oklahoma must be renewed:

  • Every 6 months
  • Every 1 year 1 / 3
  • Every 2 years
  • Every 3 years

Rationale: Oklahoma contractor licenses are required to renew

annually.

3. OSHA regulates workplace safety under:

A. EPA

  • Department of Labor

C. FEMA

D. ANSI

Rationale: OSHA is a federal agency under the U.S. Department of

Labor enforcing safety regulations.

4. The term “substantial completion” means:

  • Final payment issued
  • Construction is sufficiently complete for intended use
  • All inspections finished
  • Punch list complete

Rationale: Substantial completion allows occupancy even if minor

work remains.

5. Workers must be trained on hazardous materials according to:

  • Fair Labor Standards Act
  • Hazard Communication Standard
  • Davis-Bacon Act
  • Clean Water Act 2 / 3

Rationale: The HazCom Standard ensures training, labeling, and SDS

documentation.

6. The best type of contract when project scope is not fully defined:

  • Lump sum
  • Unit price
  • Cost-plus
  • Fixed fee with penalty

Rationale: Cost-plus adjusts for unknown work scope.

  • The building code used widely in Oklahoma for commercial

construction:

A. NFPA 101

B. IPC

C. IBC

D. NEC

Rationale: The International Building Code is the foundational

commercial code.

8. A lien must be filed in Oklahoma generally within:

  • 15 days after last work
  • 60 days after start
  • 90 days after last furnishing labor or materials
  • 120 days after invoice

Rationale: Oklahoma statutes typically require lien filing within 90

days.

  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

This document featured in-depth analysis that enhanced my understanding. Such an superb resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Jan 2, 2026
Description:

Oklahoma Building Contractor Licensing Exam Practice Test Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf 1. The primary purpose of the Oklahoma Uni...