• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Exam Questions And Correct Answers

Class notes Jan 3, 2026 ★★★★☆ (4.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

CA D64 Non-specialized Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf

  • Which of the following is the primary responsibility of a general
  • contractor?

  • Designing electrical systems
  • Managing construction projects
  • Installing plumbing fixtures
  • Conducting soil testing

Rationale: The general contractor coordinates and manages all

aspects of a construction project rather than performing specialized trade work.

  • What type of insurance is required for contractors to protect against on-
  • site injuries?

  • Property insurance
  • Vehicle insurance
  • Workers' compensation insurance
  • Liability insurance

Rationale: Workers’ compensation insurance covers medical costs

and lost wages for employees injured on the job.

  • When preparing a construction bid, what is the most important factor to
  • consider?

  • Project timeline only
  • Project scope and costs
  • Brand of materials
  • Number of subcontractors 1 / 3

Rationale: Accurate bids require understanding the full project scope

and associated costs.

  • Which document legally authorizes a contractor to start work?
  • Proposal
  • Estimate
  • Building permit
  • Invoice

Rationale: A building permit is issued by local authorities and legally

allows construction to begin.

  • What is the main purpose of a lien in construction?
  • To schedule subcontractors
  • To secure insurance
  • To protect contractors if payment is not received
  • To reduce project costs

Rationale: A lien is a legal claim against a property to ensure

payment for labor or materials.

  • Which of the following best describes a “change order”?
  • Canceling a contract
  • Submitting a bid
  • Modifying the original contract scope
  • Ordering supplies

Rationale: Change orders document agreed-upon modifications to

the original construction plan.

  • Which safety standard is enforced by OSHA on construction sites?
  • Fire code
  • Electrical code
  • Occupational safety regulations
  • Building height restrictions

Rationale: OSHA regulations are specifically designed to protect

workers’ safety in construction and other industries.

  • What is the minimum frequency for site safety inspections?
  • Once a year
  • Once a month
  • Daily or weekly depending on project
  • Only when accidents occur

Rationale: Safety inspections should be frequent to identify hazards

and maintain compliance. 2 / 3

  • In project management, what is a Gantt chart used for?
  • Tracking employee wages
  • Scheduling tasks and timelines
  • Calculating material costs
  • Designing blueprints

Rationale: Gantt charts visually display project schedules, tasks, and

timelines.

  • Which type of bond guarantees a contractor will complete the
  • project according to contract terms?

  • License bond
  • Performance bond
  • Payment bond
  • Bid bond

Rationale: Performance bonds protect the client by ensuring

contractual obligations are met.

  • Which material is commonly used for framing residential walls?
  • Concrete block
  • Brick
  • Wood studs
  • Steel mesh

Rationale: Wood studs are standard in non-specialized residential

framing.

  • What is the purpose of a project punch list?
  • To order materials
  • To hire subcontractors
  • To identify unfinished or deficient work
  • To prepare the budget

Rationale: The punch list ensures all incomplete or nonconforming

work is corrected before project closeout.

  • When is a final inspection typically performed?
  • Before construction begins
  • After project completion
  • During project design
  • During material delivery

Rationale: Final inspections verify that work meets code

requirements and project specifications.

  • / 3

User Reviews

★★★★☆ (4.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★☆

I was amazed by the in-depth analysis in this document. It was a perfect resource for my project. Truly excellent!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Class notes
Added: Jan 3, 2026
Description:

CA D64 Non-specialized Contractor Exam Questions And Correct Answers (Verified Answers) Plus Rationale2026 Q&A| Instant Download Pdf 1. Which of the following is the primary responsibility of a gen...

Unlock Now
$ 1.00