1 NCCCO Mobile Crane Actual Exam ( / ) – Questions and 100% Correct Verified Answers | Grade A
Safety
- What should an operator do if the crane’s load line contacts an energized power line
- Jump from the cab, feet together
- Stay in the cab until lines are de-energized
- Climb down carefully from the crane
- Move the crane away from the line
with no immediate danger like fire?
Correct Answer: B. Stay in the cab until lines are de-energized
Rationale: Staying in the cab prevents electrical injury until the power line is de- energized, per OSHA 1926.1408. Leaving the cab or moving the crane risks electrocution.
- What is the minimum distance a crane must maintain from power lines rated below
- 6 feet
- 10 feet
- 15 feet
- 20 feet
50 kV?
Correct Answer: B. 10 feet
Rationale: OSHA 1926.1408 requires a minimum 10-foot clearance for power lines
under 50 kV to prevent electrical hazards.
- When is it permissible for a person to ride the headache ball?
- During light loads
- Never
- With supervisor approval
- For short distances
Correct Answer: B. Never
Rationale: Federal regulations (OSHA 1926.1431) prohibit riding the headache ball under all circumstances due to safety risks.
- What is the best procedure if underground utilities are present at the crane setup
site? 1 / 2
2
- Proceed with setup as planned
- Contact the utility company
- Use smaller outrigger pads
- Avoid using outriggers
Correct Answer: B. Contact the utility company
Rationale: Contacting the utility company ensures underground hazards are identified and marked, per OSHA 1926.1402, preventing accidents.
- Who should an operator respond to when receiving a “stop” signal?
- Appointed signal person only
- Project manager only
- Anyone
- Superintendent only
Correct Answer: C. Anyone
Rationale: OSHA 1926.1417 requires operators to obey a stop signal from anyone to ensure immediate safety.
- What is the wind speed limit for ceasing hoisting operations unless specified
- 20 mph
- 25 mph
- 30 mph
- 35 mph
otherwise by the manufacturer?
Correct Answer: C. 30 mph
Rationale: ASME B30.5 recommends ceasing hoisting at wind speeds of 30 mph unless manufacturer guidelines allow otherwise, due to stability risks.
- What is the primary concern if a crane experiences side loading during a lift?
- Load swinging
- Boom damage
- Hydraulic failure
- Outrigger collapse
Correct Answer: B. Boom damage
Rationale: Side loading stresses the boom, risking structural failure, per ASME B30.5.Other issues may occur but are secondary.
- What must be ensured before operating a crane near a trench?
- Outriggers are fully retracted
- Ground stability is assessed
- Load is reduced by 50%
- Crane is operated at maximum radius
Correct Answer: B. Ground stability is assessed
Rationale: Assessing ground stability prevents crane tip-over near trenches, per OSHA
1926.1402. Other actions are incorrect or unsafe.
- What should be done with materials placed under overhead energized power lines?
- Lifted with extra care
- Dragged out
- Not lifted by crane
- Lifted as normal
Correct Answer: C. Not lifted by crane